Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Public Necessity
Project ID (if applicable): 20104MF1BX01
Vendor/Entity Legal Name (if applicable): Not applicable
MWDBE Contracted Goal (if applicable): Not applicable
MWDBE Current Participation (if applicable): Not applicable
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Request Summary (Agenda Caption):
title
Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, one (1) road easement and one (1) fee simple tracts for the public project known as Spring Stuebner Rd Segment E from 500-ft West of Leitner Way Dr to West of SH99 - 2019, for the purpose of roadway construction, UPIN 20104MF1BX01, Precinct 3.
end
Background and Discussion:
The project involves the upgrade Spring Stuebner Road, from west of Leitner Way to State Highway 99, as a 4-lane concrete pavement section with improved drainage accommodations in a 100-foot right-of-way. A detention basin is required for mitigation. The geometry of a basin will follow HCFCD design criteria and have 4:1 or flatter side slopes. Property acquisition is required to construction detention basin.
Expected Impact:
The expected impact of the project includes improved traffic flow and reduced congestion, enhanced safety for drivers and pedestrians, and better stormwater management, which will mitigate flooding issues. Additionally, the upgrade will support regional development by providing a more reliable and efficient transportation corridor, ultimately enhancing connectivity, and boosting local economic growth.
Alternative Options:
If not approved, the road and drainage systems will remain unchanged.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Hous...
Click here for full text