Title: Request for approval to negotiate with Lockwood, Andrews, and Newnam, Inc. to provide professional engineering services for the design, survey, and construction of a rebuild traffic signal with pedestrian appurtenances at Space Center Boulevard at West Linkage Road, UPIN 24035MF3HU01, Precinct 2.
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

Project ID (if applicable): UPIN - 24035MF3HU01
Vendor/Entity Legal Name (if applicable): Lockwood, Andrews, and Newnam, Inc.

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval to negotiate with Lockwood, Andrews, and Newnam, Inc. to provide professional engineering services for the design, survey, and construction of a rebuild traffic signal with pedestrian appurtenances at Space Center Boulevard at West Linkage Road, UPIN 24035MF3HU01, Precinct 2.
end

Background and Discussion:
Traffic signals are constructed to improve the operation of an intersection and better facilitate pedestrian activities. As such, the consultant will be tasked with the signal design of the intersection and an evaluation of left turn storage to improve operations. The consultant will be tasked with evaluating pedestrian accessibility through the provision of crosswalks and associated median nose opening adjustments required to facilitate pedestrian activities.

Expected Impact:
Designing and building the traffic signal at this intersection will improve operations and better facilitate pedestrian activities.

Alternative Options:
An alternative is to not build the signal at the intersection, which will not provide up to date operations and pedestrian benefits.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
x Transportation
_ Flooding
_ Environment
_ Governance and Customer Service

Prior Court Action (if any):
Date
Agenda Item #
Action Taken
N/A
N/A
N/A

Location:
Address (if applicable): Space Center Boulevard at West Linkage Road
Precinct(s): Precinct...

Click here for full text