Harris County Logo
File #: 24-2170    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 4/9/2024 In control: Commissioners Court
On agenda: 4/23/2024 Final action: 4/23/2024
Title: Request for approval of a change in contract with Tree Guy, LLC in connection with Recovery Resiliency Division - Crosby Township/MUD Drainage Improvements Franta Street Area 2018 - Clearing of Right-of-Ways and Related Items for Harris County - On-Call Contract, with an addition in the amount of $649.16, Job No. 20/0258-2, UPIN 21208MF1WZ01, Precinct 3, Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program.
Sponsors: Mony Hossain

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 20/0258, UPIN 21208MF1WZ01

Vendor/Entity Legal Name (if applicable): Tree Guy, LLC

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - project was awarded prior to launch of County's M/WBE Program

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Tree Guy, LLC in connection with Recovery Resiliency Division - Crosby Township/MUD Drainage Improvements Franta Street Area 2018 - Clearing of Right-of-Ways and Related Items for Harris County - On-Call Contract, with an addition in the amount of $649.16, Job No. 20/0258-2, UPIN 21208MF1WZ01, Precinct 3, Justification for 0% MWDBE Participation Goal:  N/A - project was awarded prior to launch of County's M/WBE Program.

end

 

Background and Discussion:

The purpose of this project is to improve drainage within specific project areas of Crosby Township/MUD by increasing drainage capacity and reducing the water surface elevations for extreme storm events. The Franta Street area is drained by roadside ditches, which ultimately drain into an existing side lot swale draining southward to the existing drainage ditch serving the adjacent Union Pacific railroad. The railroad ditch drains westward, across Miller Wilson Road, before draining into the upstream reaches of HCFCD Unit No. R106-00- 00, a tributary of Jackson Bayou. The project specific to this change in contract is located at the intersection of Franta Street and Werchan Street, in Crosby, TX, Precinct 3.

 

The Change in Contract request includes new items for the following:

 

PCO - 3, Mowing: Additional cost in the amount of $649.16 and added 0 days. Changes include an addition of $649.16 Labor Crew 3:1 Supervisor and 4 Laborers for construction of additional items not on the existing purchase order. These included mowing of the project area prior to hydro-seeding.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation
of structural flood damage to homes in the community. This modification is a step in the process to reduce the
financial, physical, and emotional burden flood damage places on homeowners and will reduce the financial
impact of recovery costs to the Crosby Township/MUD Drainage Improvements Franta Street Area 2018 homeowners, Harris County, and FEMA. The fiscal impact for this project will come from the 1080 Fund, for the Recovery and Resiliency Division subdivision projects with the long-term goal of reducing drainage costs in the future. No impact to project schedule or staffing anticipated.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be compensated for completing the original scope of work.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10-25-2022

153

Contract Awarded

 

Location: Franta Street and Miller Wilson Road, Crosby, TX

Address (if applicable): N/A

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

$649.16

$649.16

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$649.16

$649.16

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$649.16

$649.16

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: April 23, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Director of Disaster & Recovery Resiliency Division, Harris County Engineering Department

 

Attachments (if applicable): Change in Contract (CIC)