Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): UPIN 19101MF12F01
Vendor/Entity Legal Name (if applicable): Arcadis U.S., Inc.
MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program
Request Summary (Agenda Caption):
title
Request for approval to amend a professional services agreement with Arcadis U.S., Inc. for Construction Phase Services in the amount of $17,643.00 in connection with Fountainview Sec. 1 & 2 Subdivision Drainage Improvements - 2018, UPIN 19101MF12F01, Precinct 1.
end
Background and Discussion:
The Fountainview Subdivision is bound by Harris County Flood Control District (HCFCD) Unit# P133-00-00 on the north, Aldine Bender Road on the south, HCFCD Unit# P133-04-00 on the west, and HCFCD Unit# P133-03-00 on the east. The majority of the project area is residential, comprised of single-family homes with concrete sidewalks and a curb and gutter storm sewer system. An evaluation of the existing storm sewer system showed that the existing storm sewer pipes do not meet current County criteria due to insufficient capacity to convey the 2-year storm event. In addition to the undersized storm sewer within the neighborhood, it was also determined that the receiving channels restrict the study area’s ability to drain. The proposed solution includes upsizing existing storm sewer to convey the 2- year storm event and incorporating a detention pond to mitigate increases in flow prior to outfalling into P133-00-00.
The proposed upsized storm sewers within the public right of way, conflict with a sanitary sewer owned by Central States Water Resources LLC (CSWR). Various alternatives have been reviewed to resolve the conflict. The most effective solution required a redesign of a segment of storm sewer to a shallower profile to avoid the conflict.
The Engineer of Record will continue to provide engineering services during the construction phase to ensure that the redesign meets project requirements.
Expected Impact:
Executing this agreement amendment will ensure that the utility conflict between a sanitary sewer and proposed drainage improvements in the construction phase, are monitored in accordance with the project objectives.
Alternative Options:
Alternative options include choosing not to execute this amendment, possibly not completing the project as designed.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
X Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
1/31/2023 |
40 |
Agreement approved |
1/7/2020 |
1.e.1 |
Authorization to Negotiate approved |
Location: Fountainview Subdivision
Address (if applicable): N/A
Precinct(s): Precinct 1
Fiscal and Personnel Summary |
Service Name |
Construction Phase Services |
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
1080 - Infrastructure Fund |
$ |
$17,643.00 |
$17,643.00 |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Current Budget |
$ |
$17,643.00 |
$17,643.00 |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Request |
$ |
$17,643.00 |
$17,643.00 |
$ |
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: April 23, 2024
Anticipated Implementation Date (if different from Court date):
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Harris County Engineering Department
Attachments (if applicable): Amended Agreement