File #: 24-1389    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 3/12/2024 In control: Commissioners Court
On agenda: 3/26/2024 Final action: 3/26/2024
Title: Request for approval to execute an amendment with LJA Engineering, Inc. in the amount of $238,460.00 for Professional Engineering Services in connection with Houmont Park Subdivision Drainage Improvements-2018, UPIN 19101MF14G01, Precinct 1.
Sponsors: Mony Hossain
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): UPIN 19101MF14G01
Vendor/Entity Legal Name (if applicable): LJA Engineering, Inc.

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program

Request Summary (Agenda Caption):
title
Request for approval to execute an amendment with LJA Engineering, Inc. in the amount of $238,460.00 for Professional Engineering Services in connection with Houmont Park Subdivision Drainage Improvements-2018, UPIN 19101MF14G01, Precinct 1.
end

Background and Discussion:
This project is located in northeast Harris County in the Greens Bayou (P100-00-00) watershed, east of John Ralston Road and north of Beaumont Highway. The existing drainage system is comprised of three earthen, trapezoidal open channels (P110-00-00, P110-04-00 and P117-00-00) owned and maintained by Harris County Flood Control District (HCFCD). The proposed improvements include re-grading the existing roadside ditches 1,000-feet east and west of the existing drainage channels, replacing inadequate driveway and roadway culverts and channel improvements of the HCFCD Unit Numbers P117-00-00, P110-04-00, and P110-00-00. Other improvements include a detention basin to cause no adverse impacts downstream and Green River Dr close system drainage. This amendment adds design scope for Green River Dr road reconstruction.

Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Houmont Park community. The addition of pavement reconstruction design to the subdivision drainage project will provide construction efficiencies while impr...