File #: 24-1609    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 3/14/2024 In control: Commissioners Court
On agenda: 3/26/2024 Final action: 3/26/2024
Title: Request for approval of a change in contract with DVL Enterprises LLC in connection with final construction of the Long Play Subdivision Drainage Improvements - 2018, adding 19 calendar days, with an addition in the amount of $96,308.73, Job No. 22/0175-3, UPIN 19101MF16C01, Precinct 1, MWDBE Contracted Goal: 21%, MWDBE Participation Goal: 3.39%.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 22/0175; UPIN: 19101MF16C01 

Vendor/Entity Legal Name (if applicable): DVL Enterprises LLC

 

MWDBE Contracted Goal (if applicable): 21%

MWDBE Current Participation (if applicable): 3.39%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with DVL Enterprises LLC in connection with final construction of the Long Play Subdivision Drainage Improvements - 2018, adding 19 calendar days, with an addition in the amount of $96,308.73, Job No. 22/0175-3, UPIN 19101MF16C01, Precinct 1, MWDBE Contracted Goal: 21%, MWDBE Participation Goal: 3.39%.

end

 

Background and Discussion:

The Long Play subdivision is located in eastern Harris County, Texas, north of Garrett Road, east of Beltway 8, and west of the San Jacinto River Authority (SJRA) aqueduct. The Long Play subdivision is transected by Game Cove Lane and Long Play Lane. The Garrett Road outfall channel, also known as Harris County Flood Control District (HCFCD) Channel G103-12-00, flows from west to east, parallel to Garrett Road, from the Long Play subdivision to the San Jacinto River. Sheet flow within the subdivision is collected by the roadside ditches which discharge into the Garrett Road outfall channel. Under existing conditions, the Long Play subdivision has experienced recurring flood damage during multiple separate rain events. There have been at least seven separate storm events that have caused flood damage to structures in the subdivision according to FEMA repetitive loss records.

 

The Change in contract request includes new items for the following:

                     Final Adjustments: The deduction of $49,594.98 for reconciliation of actual quantities used in construction with estimated quantities used for completing the proposed scope of work

                     Steel Plates to protect road - Added a new line-item for steel plates to protect vehicles from hitting existing failed asphalt paving. Failure of the asphalt pavement was pre-existing. This includes adding new line item “Steel Plate” 1 Lump Sum at an addition cost of $6,305.91 and 0 days.

                     Adding new line-items for temporary driveways to be provided during the installation of the proposed storm pipes and the concrete driveway. This includes the addition of new line items #087- “Temporary Residential Driveway (DW)” 513 square at a Unit Price of $30.55/SY; #088-“Temporary Commercial DW 12 inch 526 square yard at a Unit Price $37.74/square yard; #089  -“Temporary Commercial DW 10 inch 467 square yard at a Unit Price $34.31/SY; #090 - “Temporary Commercial DW 8 inch 419 square yard at a Unit Price $31.07/square yard; #091 - “Temporary Commercial DW Concrete 12 inch 347 square yard at a Unit Price of $44.15/square yard  with an additional cost of $79,901.65  and 7 days.

                     Adding new line-item for the removal and replacement of existing 48 inch Corrugated Metal Pipe at station 58+50 Garret Rd. This was at the petition of the Precinct during the Final Inspection Walk on June 5, 2023. This includes the addition of new line item #086- “48 inch Corrugated Metal Pipe at station 58+50 Garret Rd” 1 lump sum at an additional cost of $34,936.00 and 7 days.

                     Adding new line-item for the escalation in price for Concrete. Contractor requested to be compensated for the increased in cost of High Early Strength Concrete stipulated on their supplier Texas Concrete Quote. The increase in price was due to National shortage of cement and Fuel Surcharges for delivery. The contract included an escalation clause in the Specifications under “Special Requirements”.  This includes the addition of new line item #085- “Escalation Concrete” 1 lump sum at an additional cost of $8,960.15 and 0 days.

                     Adding new line-item for the furnishing and the installment of a new sign. At the petition of the constituents in the neighborhood and the approval of the EOR, the Precinct and Disaster and Resiliency Division a new R5-2 NO TRUCKS ALLOWED Sign was installed at the corner of Long Play Lane and Garret Road. This includes the addition of new line items #084 - “New Traffic Sign” 1 each at an additional cost of $600.00 and 1 days.

                     Adding new line-item for the replacement of 4 headwalls for Driveways 8 and 9 on Long Play Lane. This scope of work performed to replace the existing headwalls that were removed during the installation of the proposed driveways. The EOR, the Precinct, and Disaster and Resiliency Division agreed to the change. This includes the addition of new line items #083 - “Driveway Headwalls” 4 each at a Unit Price $3,800.00. with an additional cost of $15,200.00 and 4 days.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Long Play Subdivision Drainage Improvements - 2018.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be able to complete the original scope of work.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/23/2022

256

Contract Award

04/25/2023

55

Change In Contract

08/08/2023

65

Change In Contract

 

 

 

 

Location: Long Play Subdivision Drainage Improvements - 2018

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

$96,308.73

$96,308.73

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$96,308.73

$96,308.73

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$96,308.73

$96,308.73

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: March 26, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E, CFM, Director of Disaster and Resiliency Division, Harris County Engineering Department

 

Attachments (if applicable): Change in Contract (CIC)