Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Interlocal Agreement
Project ID (if applicable): UPIN 19101MF17F01
Vendor/Entity Legal Name (if applicable): Greenwood Utility District
MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program
Request Summary (Agenda Caption):
title
Request for approval of an amendment to a Drainage Facilities Reimbursement agreement with Greenwood Utility District for water and sanitary sewer facility relocations, and encroachment resolution in connection with Parkway (Mobile Homes) Subdivision Drainage Improvements, UPIN 19101MF17F01, Precinct 1, Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to the launch of County's M/WBE Program.
end
Background and Discussion:
The Parkway (Mobile Homes) Subdivision is located in Precinct 1, northeast Harris County, north of the intersection of Park Trail Drive and Tidwell Road. The current neighborhood drainage system consists of existing curb & gutter streets with an existing storm sewer system that ultimately outfalls into HCFCD maintained P122-00-00 channel. The existing drainage pipe system is undersized and causes surface water to back up at the intake areas. This causes localized flooding at the intersections of roads. The scope of the project includes pavement replacement, curb replacement, increasing storm sewer capacity in the existing systems by upgrading storm sewer and constructing a wet bottom detention basin.
The project still has significant encroachments into ROW that need to be resolved prior to construction phase. Greenwood Utility District will resolve all encroachments and in return Harris County will pay for the water and sanitary sewer relocations. The project will rebid once encroachments have been resolved.
Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Parkway (Mobile Homes) community. This agreement amendment will expedite bid and construction phase schedule. No impact on project cost anticipated.
Alternative Options:
Alternative options include choosing not to enter into an agreement amendment with Greenwood Utility District for utility relocations and encroachments, thereby requiring Harris County to remove encroachments prior to or during construction.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
X Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
08/29/23 |
73 |
Approval of Interlocal Agreement |
Location:
Address (if applicable): Parkway (Mobile Homes) Subdivision
Precinct(s): Precinct 1
Fiscal and Personnel Summary |
Service Name |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Current Budget |
$ |
$ |
$ |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Request |
$ |
$ |
$ |
$ |
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: February 27, 2024
Anticipated Implementation Date (if different from Court date):
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Director of Disaster & Resiliency Division, Harris County Engineering Department.
Attachments (if applicable): Interlocal Agreement Amendment