Department: Housing and Community Development
Department Head/Elected Official: Thao Costis, Executive Director
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): C2023-005c, C2023-005d, C2023-005a, & C2023-005e
Vendor/Entity Legal Name (if applicable): Harris County Precinct Two
MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Request Summary (Agenda Caption):
title
Request for approval of four Community Development Block Grant Entitlement (CDBG-EN) funded agreements with (1) Harris County Precinct Two for Airline Improvement District Zone 3 West Bertrand Water and Sanitary Sewer project; (2) Harris County Precinct Two for Parkwood Estates for Water Distribution System Phase 4 (Olana) project; (3) Crosby Municipal Utility District for Surface Water Treatment Plant Facilities Improvements project; and (4) Harris County Water Control and Improvement District No. 21 for Drinking Water and Fire Protection Improvements project.
end
Background and Discussion:
On January 10, 2023 and August 8, 2023, Harris County Commissioners Court approved the PY23 Annual Plan for Entitlement funds, which included a global project that is supported by the above referenced Infrastructure Investments project activities.
(1) Harris County Precinct Two for Airline Improvement District Zone 3 West Bertrand Water and Sanitary Sewer Project - provide reliable drinking water and fire hydrants to bring public water/sewer to areas where residents use water wells prone to contamination and failing septic systems that can contaminate water wells and roadside ditches/public waterways. Construction includes water lines services connections and plugging of water wells. This shall benefit one thousand eight hundred fifteen (1,815) persons, which is (57.80%) are low to moderate income in Precinct Two.
(2) Harris County Precinct Two for Parkwood Estates for Water Distribution System Phase 4 (Olana) project - provide reliable drinking water and fire hydrants to bring public water/sewer to areas where residents use water wells prone to contamination and failing septic systems that can contaminate water wells and roadside ditches/public waterways. Construction includes water lines services connections and plugging of water wells. This shall benefit one thousand three hundred twenty (1,320) persons, which is (67.35%) are low to moderate income in Precinct Two.
(3) Crosby Mud Utility District for Surface Water Treatment Plant Facilities Improvements project - to improve the Surface Water Treatment Plant (SWTP) Facilities and relocate the existing Settling Basins from the SWTP West Tract to the SWTP East Tract. Settlement debris will be settled and beneficially land applied in energy efficient manner and environmentally friendly method that will benefit all of Crosby MUD. This shall benefit three thousand seven hundred ten (3,710) persons, which is (41.99%) are low to moderate income in Precinct Two.
(4) Harris County Water Control and Improvement District No. 21 for Drinking Water and Fire Protection Improvements project - replacement of aging and deteriorated water line pipes on North Brentwood and on South Drive to improve water quality, pressure, reliability, and fire-fighting capability. This shall benefit one thousand six hundred forty (1,640) persons, which is (63.94%) are low to moderate income in Precinct Two.
Expected Impact:
To provide funding for infrastructure investments project activities that meet the needs of low-and moderate-income residents in Harris County. The anticipated fiscal impact to the County of the three agreements is $3,323,995 in CDBG-EN funds.
Alternative Options:
If the agreements are not approved, then low-and moderate-income households in the Harris County Service area will not benefit from the respective infrastructure investments project activities.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
X Public Health
_ Transportation
_ Flooding
X Environment
_ Governance and Customer Service
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
|
|
|
Location:
Address (if applicable): N/A
Precinct(s): Precinct 2
Fiscal and Personnel Summary |
Service Name |
Infrastructure Investments |
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
Grant |
$44,949 |
$635,403 |
$680,352 |
$2,804,827 |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Current Budget |
$44,949 |
$635,403 |
$680,352 |
$2,804,827 |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Request |
$ |
$ |
$ |
$ |
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: February 27, 2024
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Mike Nguyen, Assistant Director-Infrastructure Investments Housing & Community Development
Attachments (if applicable): Subrecipient Agreements