Harris County Logo
File #: 24-0782    Version: 1 Name:
Type: Proposals/Bids Status: Passed
File created: 2/2/2024 In control: Commissioners Court
On agenda: 2/27/2024 Final action: 2/27/2024
Title: Request for approval for advertisement to obtain construction bids for concrete repairs at the Washburn Tunnel (Precinct 2). MWDBE Contracted Goal: 20%.
Department: Toll Road Authority
Department Head/Elected Official: Roberto Trevi?o, P.E., Executive Director

Regular or Supplemental RCA: Regular RCA

Type of Request: Proposals/Bids

Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): N/A

MWDBE Contracted Goal (if applicable): 20%
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above

Request Summary (Agenda Caption):
title
Request for approval for advertisement to obtain construction bids for concrete repairs at the Washburn Tunnel (Precinct 2). MWDBE Contracted Goal: 20%.
end

Background and Discussion:
Re-occurring inspections of the Washburn Tunnel are performed by TxDOT and HCTRA's engineering consultants and generate inspection reports that contain issues that need to be addressed. These repairs will address items identified from inspection reports.

Expected Impact:
This project will repair concrete cracks and spalling of the tunnel liner, masonry brick, and other related concrete items at the Washburn Tunnel to ensure continued proactive maintenance of HCTRA's infrastructure.

Alternative Options:
No other recommended solution for this identified need.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
_ Flooding
_ Environment
_ Governance and Customer Service

Prior Court Action (if any):
Date
Agenda Item #
Action Taken
8/24/2021
139
Approval of Agreement with HDR Engineering, Inc. to perform comprehensive program to preserve, maintain, repair, and improve the existing Washburn Tunnel Facility.

Location: Washburn Tunnel
Address (if applicable): 3100 Federal Road, Houston, Texas 77015
Precinct(s): Precinct 2

Fiscal and Personnel Summary
Service Name
Washburn Tunnel operations and maintenance


Current Fiscal Year Cost
Annual Fiscal Cost

Labor
Non-Labor
Total
Recurring Expenses
Funding Sources

Existing Budget




Choose an ite...

Click here for full text