File #: 23-6820    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 11/6/2023 In control: Commissioners Court
On agenda: 11/14/2023 Final action: 11/14/2023
Title: Request for approval of an amendment to an agreement with IDS Engineering Group Inc., for Professional Engineering Services in connection with a Corridor Study- Holzwarth Rd - from Cypresswood Dr. to Spring Cypress Rd in the amount of $15,085.40, UPIN 23103MF2PH01, Precinct 3, MWDBE Contracted Goal: 20%, MWDBE Current Participation: 90.91%.
Sponsors: Mony Hossain
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): UPIN 23103MF2PH01
Vendor/Entity Legal Name (if applicable): IDS Engineering Group Inc.

MWDBE Contracted Goal (if applicable): 20%
MWDBE Current Participation (if applicable): 90.91%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above

Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with IDS Engineering Group Inc., for Professional Engineering Services in connection with a Corridor Study- Holzwarth Rd - from Cypresswood Dr. to Spring Cypress Rd in the amount of $15,085.40, UPIN 23103MF2PH01, Precinct 3, MWDBE Contracted Goal: 20%, MWDBE Current Participation: 90.91%.
end

Background and Discussion:

The Holzwarth Road corridor is in northwest Harris County and the roadway is classified as a major thoroughfare with high volumes of traffic. A significant number of accidents have been reported for portions of this corridor. A contract amendment for additional services for traffic engineering services related to median openings design and evaluation is necessary to proceed with the study.

Expected Impact:

Executing the amendment will allow the consultant to proceed with the study of the Holzwarth Road corridor to further evaluate traffic conditions along this corridor and provide alternatives to improve traffic conditions.

Alternative Options:

The alternative is to not conduct the median openings design and evaluation, proceed with the corridor study, and leave the median openings as-is.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
_ Flooding
_ Environment
_ Governance and Customer Service

Prior Court Action (if any):
Date
Agenda Item #
Action Taken
06/28/2022
98
Authorization to Negot...

Click here for full text