File #: 23-6634    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 11/2/2023 In control: Commissioners Court
On agenda: 11/14/2023 Final action: 11/14/2023
Title: Request for approval to negotiate an agreement with AKV Consultants, LLC to provide preliminary engineering, design, bidding, and construction phase services in support of conveyance improvements on HCFCD Unit C143-00-00. (Sims Bayou Watershed, Bond ID F-94, Project ID C143-00-00-E001, Precinct 1).
Attachments: 1. 111423 ATN AKV 2023-37 PCT 1 backup
Department: Flood Control District
Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

Project ID (if applicable): C143-00-00-E001
Vendor/Entity Legal Name (if applicable): AKV Consultants, LLC

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/AN/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval to negotiate an agreement with AKV Consultants, LLC to provide preliminary engineering, design, bidding, and construction phase services in support of conveyance improvements on HCFCD Unit C143-00-00. (Sims Bayou Watershed, Bond ID F-94, Project ID C143-00-00-E001, Precinct 1).
end

Background and Discussion:
This project was recommended by the C143-00-00 feasibility study. Its purpose is to reduce the risk and severity of flooding in the C143-00-00 watershed which has experienced repetitive losses. The project consists of replacing the existing culvert at Anderson Road and HCFCD Unit No. C143-00-00 as well as providing detention storage. This work will be done in conjunction with the Harris County Engineering Department Anderson Road project through a joint funding structure agreement approved by the Commissioners Court on July 18, 2023. Bond ID F-94 occurs in the 3rd quartile under the 2022 Prioritization Framework approved by Commissioners Court.

Expected Impact:
This item will allow the Flood Control District to negotiate with AKV to develop a scope and cost to conduct preliminary engineering, design, bidding, and construction phase engineering services specifically for the location, alternatives analysis, and design of stormwater detention storage.

Alternative Options:
The alternative, should this authorization to negotiate not be approved, is that the Flood Control District would need to seek a new consultant, which ...