Department: Flood Control District
Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Regular or Supplemental RCA: Regular RCA
Type of Request: Interlocal Agreement
Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): Harris County Engineering Department
MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Request Summary (Agenda Caption):
title
Request for approval of a joint funding structure between the Flood Control District and the Office of the County Engineer for the expansion and enhancements of Cypress Park Stormwater Detention Basin, HCFCD Unit K500-01-00. (Cypress Creek Watershed, Bond IDs Z-04 and Z-05, Agreement No. 2019-146, Precinct 3).
end
Background and Discussion:
Cypress Park Stormwater Detention Basin, HCFCD Unit K500-01-00 expansion is situated along Cypress Creek, HCFCD Unit K100-00-00 in Precinct 3. Harris County Engineering and Harris County Commissioner Precinct 3 have prepared a design for a gate system and basin expansion to be integrated into the existing stormwater detention basin operation. This is an innovative pilot project exploring the use of pump stations as a method to facilitate flood risk reduction. The Flood Control District intends to contribute a maximum of $1,500,000 from Bond ID Z-04 and $3,500,000 from Bond ID Z-05 towards the basin enhancements. Upon completion of the project, Harris County Precinct 3 will maintain and operate the gate system.
Expected Impact:
The joint project and funding structure will facilitate more efficient and cost-effective governmental services. Additionally, this demonstration project is intended to assess the effectiveness of gate and pump systems as a tool in providing flood risk reduction in the region. Lastly, this project is another example of how Harris County and Flood Control District leverage sha...