Harris County Logo
Share to Facebook Share to Twitter Bookmark and Share
File #: 23-6632    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 11/2/2023 In control: Commissioners Court
On agenda: 11/14/2023 Final action: 11/14/2023
Title: Request for approval of a joint funding structure between the Flood Control District and the Office of the County Engineer for the expansion and enhancements of Cypress Park Stormwater Detention Basin, HCFCD Unit K500-01-00. (Cypress Creek Watershed, Bond IDs Z-04 and Z-05, Agreement No. 2019-146, Precinct 3).
Attachments: 1. 111423 JOINT FUNDING AGMT CYPRESS PCT 3 backup
Department: Flood Control District
Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): Harris County Engineering Department

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval of a joint funding structure between the Flood Control District and the Office of the County Engineer for the expansion and enhancements of Cypress Park Stormwater Detention Basin, HCFCD Unit K500-01-00. (Cypress Creek Watershed, Bond IDs Z-04 and Z-05, Agreement No. 2019-146, Precinct 3).
end

Background and Discussion:
Cypress Park Stormwater Detention Basin, HCFCD Unit K500-01-00 expansion is situated along Cypress Creek, HCFCD Unit K100-00-00 in Precinct 3. Harris County Engineering and Harris County Commissioner Precinct 3 have prepared a design for a gate system and basin expansion to be integrated into the existing stormwater detention basin operation. This is an innovative pilot project exploring the use of pump stations as a method to facilitate flood risk reduction. The Flood Control District intends to contribute a maximum of $1,500,000 from Bond ID Z-04 and $3,500,000 from Bond ID Z-05 towards the basin enhancements. Upon completion of the project, Harris County Precinct 3 will maintain and operate the gate system.

Expected Impact:
The joint project and funding structure will facilitate more efficient and cost-effective governmental services. Additionally, this demonstration project is intended to assess the effectiveness of gate and pump systems as a tool in providing flood risk reduction in the region. Lastly, this project is another example of how Harris County and Flood Control District leverage sha...

Click here for full text