File #: 23-6781    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 11/6/2023 In control: Commissioners Court
On agenda: 11/14/2023 Final action: 11/14/2023
Title: Request for approval of a change in contract with Blazey Construction Services, LLC, in connection with Tower Oaks Plaza Subdivision drainage improvements (2018), with an addition in the amount of $98,290.00, Job No. 23/0027, UPIN 19103MF14801, Precinct 3, MWDBE Contracted Goal: 31%, MWDBE Current Participation Goal: 100%.
Sponsors: Mony Hossain
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): 23/0027; UPIN: 19103MF14801
Vendor/Entity Legal Name (if applicable): Blazey Construction Services, LLC

MWDBE Contracted Goal (if applicable): 31%
MWDBE Current Participation (if applicable): 100%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Blazey Construction Services, LLC, in connection with Tower Oaks Plaza Subdivision drainage improvements (2018), with an addition in the amount of $98,290.00, Job No. 23/0027, UPIN 19103MF14801, Precinct 3, MWDBE Contracted Goal: 31%, MWDBE Current Participation Goal: 100%.

end

Background and Discussion:
The project is located in northwest Harris County, north of Cypress North Houston Road and east of North
Eldridge Parkway. The existing drainage system consists of roadside ditches which outfall to the west of the
subdivision via 24 to 36-inch pipes at three points along HCFCD Channel K161-00-00 and to Cypress Creek
from a fourth outfall at the northeast corner of the subdivision. The scope and proposed improvements
include bringing the subdivision roadways into compliance with Harris County Standards, constructing storm
sewer underlying roadside ditches, regrading roadside ditches, upsizing and replacing driveway culverts,
replacing driveways, and the construction of a storm water detention basin.

The Change in contract request new items for the following:
* PCO-1: Removal of Septic tanks - Added New Item "Remove Septic Tanks" additional cost for the amount of $3,250.00. Change in contract is due to difference in field conditions. During Clearing and Grubbing operations at the Proposed Detention Pond area, contractor uncovered 5 septic tanks. Contractor submitted R...