Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Public Necessity
Project ID (if applicable): 15104MF0DN02
Vendor/Entity Legal Name (if applicable): Any applicable landowner and/or property interest holder
MWDBE Contracted Goal (if applicable): Not applicable.
MWDBE Current Participation (if applicable): Not applicable
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Request Summary (Agenda Caption):
title
Request for approval of a certain project, decreeing the project to be a public necessity and convenience, directing the Harris County Real Property Division to acquire, for three (3) sidewalk easement tracts for the public project known as Telge Rd Segment 4 - from 1,650-ft North of Louetta Rd to 1,780-ft North of Telge Ranch Rd - 2014, for the purpose of roadway construction, UPIN 15104MF0DN02, Precinct 3.
end
Background and Discussion:
Harris County intends to provide improvements to Telge Road which will include 5-ft sidewalks on both sides of the street. Telge Road has an established ROW width of 120' throughout much of the project except for the area adjacent to Telge Ranch Section 1, which is only 109' ROW. Telge Ranch Section 1 includes an adjacent undeveloped 10-ft utility easement where we would like to construct the sidewalk. This would allow the sidewalk to be located away from the curb. The area appears to still be owned by the developers.
Expected Impact:
Sidewalk easements will allow the sidewalk to be located away from the curb and provide a desired separation from the street and the sidewalk.
Alternative Options:
Not acquiring the sidewalk easements will result in the sidewalk being located adjacent to the curb which is not desired.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
Flooding
_ Enviro...