File #: 23-2871    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 5/9/2023 In control: Commissioners Court
On agenda: 5/16/2023 Final action: 5/16/2023
Title: Request for approval of a Joint Participation Interlocal Agreement with Northpointe Water Control and Improvement District to construct drainage improvements from the Northpointe Blvd Segment 2 Project from Northpointe Ridge Lane to Northpointe Terrace Drive and all related appurtenances, Precincts 3 & 4.
Attachments: 1. 23-2871 Partnership - Northpointe WCID P3&4.pdf
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

Project ID (if applicable): 20104MF1BQ01
Vendor/Entity Legal Name (if applicable): Northpointe Water Control and Improvement District (WCID)

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval of a Joint Participation Interlocal Agreement with Northpointe Water Control and Improvement District to construct drainage improvements from the Northpointe Blvd Segment 2 Project from Northpointe Ridge Lane to Northpointe Terrace Drive and all related appurtenances, Precincts 3 & 4.
end

Background and Discussion:
The Northpointe Blvd Segment 2 Capital Improvement Project (the Project) will widen the existing 2-lane concrete to 4-lane concrete boulevard of Northpointe Blvd, from Northpointe Ridge Lane to Northpointe Terrace Drive, with new drainage facilities.

The Project will result in drainage flowing to a detention pond owned and maintained by the Northpointe Water Control and Improvement District (the District), to ultimately outfall into the Faulkey Gully Cypress Creek (K142-00-00).

This agreement will allow Harris County runoff to convey through the District's facilities.

Expected Impact:
This project will improve mobility and safety for road users and flood resiliency for the adjacent properties.

Alternative Options:
Alternative options would be to divert the drainage runoff resulting in substantial increases in engineering design, property acquisition and construction costs.




Alignment with Goal(s):
X Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
X Flooding
X Environment
X Governance and Customer Service

Prior Court Action (if any): ...