Title: Request for approval of an amendment to an agreement with the Harris County Flood Control District utilizing 2017 Harvey CDBG-DR funds Round One Funds to authorize Design/Engineering Services to be considered part of pre-award costs for the Mercer Arboretum Detention Basin Drainage Improvement Project.
Attachments: 1. 23GEN0985_First Amendment Mercer_D2017-023_3.24.23_rev_mn EK final MJ Sig
Department: Community Services
Department Head/Elected Official: Thao Costis, Interim Executive Director

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): D2017-023
Vendor/Entity Legal Name (if applicable): Harris County Flood Control District

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program

Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with the Harris County Flood Control District utilizing 2017 Harvey CDBG-DR funds Round One Funds to authorize Design/Engineering Services to be considered part of pre-award costs for the Mercer Arboretum Detention Basin Drainage Improvement Project.
end

Background and Discussion:
Mercer Arboretum Detention Basin Drainage Project is (1) acquiring several tracts of undeveloped property totaling approximately 52.40 acres; (2) designing, engineering, and constructing a stormwater detention basin adjacent to low-to-moderate income designated communities to reduce existing and future flooding levels along Cypress Creek, thereby reducing the vulnerability of residential homes and the Mercer arboretum and Botanic Gardens to future flooding events. Project area is in Precinct 1.

This amendment authorizes design/engineering services for the project to be considered part of pre-award costs.

Expected Impact:
To Improve drainage and reduce existing and future flooding levels along Cypress Creek, thereby reducing the vulnerability of residential homes and the Mercer arboretum and Botanic Gardens to future flooding events. These activities shall benefit 11,140 persons of which 51.92% are low to moderate-income with drainage improvements.