Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Public Necessity
Project ID (if applicable): 211033961530014
Vendor/Entity Legal Name (if applicable): Any applicable landowner and/or property interest holder
MWDBE Contracted Goal (if applicable): Not applicable
MWDBE Current Participation (if applicable): Not applicable
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Request Summary (Agenda Caption):
title
Request for approval of a certain project, decreeing the project to be a public necessity and convenience, directing the Harris County Real Property Division to acquire, and authorizing eminent domain if necessary for one (1) fee simple, two (2) drainage easement and nine (9) unobstructed visibility easement tracts for the public project known as Westgreen Boulevard Segment 1 - from Morton Road to Clay Road - 2021, for the purpose of roadway construction, UPIN 211033961530014, Precinct 4.
end
Background and Discussion:
The proposed Westgreen Boulevard Segment 1 Project is a new roadway construction. The road will be a standard four lane concrete pavement within a 100-foot right-of-way and with a 32-foot median. The proposed road will connect to adjacent neighborhoods at Bent Lake Drive, Laurel Row Lane, Meadow Birch Lane, the project is concrete pavement with an underground storm sewer system. The project will include sidewalk on the western side of the ROW. The signal at Westgreen Boulevard and Clay Road will be modified to accommodate the future roadway.
Expected Impact:
The project will address current and future traffic volumes, reduce delays, provide connectivity to neighborhood destinations, improve safety for pedestrians and motorists, improve roadway conditions, and reduce flooding with drainage improvements.
Alternative Options:
If no action is taken, the public may experience delays in improving area mobility.
Alignment with Goal(s):
X Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
X Flooding
X Environment
X Governance and Customer Service
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
11/9/2021 |
23 |
Request for approval to execute an agreement with Gunda Corporation, LLC in the amount of $659,905.60 for Professional Engineering Services to provide improvements to Westgreen Boulevard Segment 1 - from Morton Road to Clay Road, UPIN 211033961530014, Precinct 3.: No Action-No Action |
12/14/2021 |
30 |
Request for approval to execute an agreement with Gunda Corporation, LLC for Professional Engineering Services for $659,905.60 to provide improvements to Westgreen Boulevard Segment 1 - from Morton Road to Clay Road, UPIN 211033961530014, Precinct 3. |
Location:
Address (if applicable): Various Locations (See attached list)
Precinct(s): Precinct 4
Fiscal and Personnel Summary |
Service Name |
|
|
FY 23 |
FY 24 |
Next 3 FYs |
Incremental Expenditures (do NOT write values in thousands or millions) |
Labor Expenditures |
$ |
$ |
$ |
Non-Labor Expenditures |
$ |
$ |
$ |
Total Incremental Expenditures |
$ |
$ |
$ |
Funding Sources (do NOT write values in thousands or millions) |
Existing Budget |
Choose an item. |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
Total Current Budget |
$ |
$ |
$ |
Additional Budget Requested |
Choose an item. |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
Total Additional Budget Requested |
$ |
$ |
$ |
Total Funding Sources |
$ |
$ |
$ |
Personnel (Fill out section only if requesting new PCNs) |
Current Position Count for Service |
- |
- |
- |
Additional Positions Requested |
- |
- |
- |
Total Personnel |
- |
- |
- |
Anticipated Court Date: January 31, 2023
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Albrina C. Coleman, Director, Real Property Division
Attachments (if applicable): Findings and Declarations, Survey Descriptions and Maps