Title: Request for approval to purchase a certain tract for a negotiated price for Harris County for the public project known as Prado Woods Subdivision Drainage Improvements - 2018, tract number 8, for $28,389.00 which is $7,389.00 over the appraised value, UPIN 19103MF16N01, Precinct 3.
Attachments: 1. 23-0605 NP - Prado Woods Subdivision Drainage Improvements - 2018, Tract 8.pdf

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Financial Authorization

 

Project ID (if applicable):  19103MF16N01

Vendor/Entity Legal Name (if applicable):  Any applicable landowner and/or property interest holder

 

MWDBE Contracted Goal (if applicable):  Not Applicable

MWDBE Current Participation (if applicable):  Not Applicable

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval to purchase a certain tract for a negotiated price for Harris County for the public project known as Prado Woods Subdivision Drainage Improvements - 2018, tract number 8, for $28,389.00 which is $7,389.00 over the appraised value, UPIN 19103MF16N01, Precinct 3.

end

 

Background and Discussion:

The Prado Woods Subdivision Drainage Improvements project is located in Northwest Harris County, within the Cypress Creek Watershed. The subdivision is serviced by a single road (Prado Woods Street) and is a private road. The existing storm water drainage system consists of open ditches which collect flows from the neighborhood and drain to the existing storm system along Grant Rd that ultimately outfalls to HCFCD Unit No. K100-00-00. Part of the existing roadside ditch south side of the street was replaced with an 18-inch pipe. Lack of conveyance capacity within the existing open ditches and/or storm pipes and lack of positive grading towards Grant Rd contributed to the reported flooding. Planned improvements include storm sewer along the street, reconstruction of the roadway improving to curb and gutter, and ROW acquisition.

 

Expected Impact:

This project seeks to reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. These acquisitions are a step in the process to reduce the financial, physical, and emotional burden flood damage places on homeowners and will reduce the financial impact of recovery costs to the Prado Woods Subdivision homeowners, Harris County, and FEMA. The fiscal impact for this project will come from the 1080 Fund, Special Mobility Funding for the Recovery and Resiliency Division subdivision projects with the long-term goal of reducing drainage costs in the future. No impact to project schedule or staffing anticipated.

 

 

 

Alternative Options:

The residents of Prado Woods Street have experienced flooding in the recent years and are ready for the proposed storm sewer upgrades and roadway improvements. If no action is taken, the residents may experience flooding again during upcoming hurricane season.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

6/14/2022

57

Public necessity to purchase

4/26/2022

32

Contract Amendment

10/26/2021

46

Contract Amendment

6/29/2021

71

Contract Award for Professional Engineering Services

 

Location:

Address (if applicable): 12119 Prado Woods Street, Cypress, TX, 77429

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

FY 23

FY 24

Next 3 FYs

Incremental Expenditures (do NOT write values in thousands or millions)

Labor Expenditures

$

$

$

Non-Labor Expenditures

$28,389.00

$

$

Total Incremental Expenditures

$28,389.00

$

$

Funding Sources (do NOT write values in thousands or millions)

Existing Budget

1080 - Infrastructure Fund

$28,389.00

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Current Budget

$28,389.00

$

$

Additional Budget Requested

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Additional Budget Requested

$

$

$

Total Funding Sources

$28,389.00

$

$

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

 

Anticipated Court Date:  January 31, 2023

Anticipated Implementation Date (if different from Court date):

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Albrina C. Coleman, Director, Real Property Division

Attachments (if applicable): Survey Map