File #: 23-0133    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 12/27/2022 In control: Commissioners Court
On agenda: 1/10/2023 Final action: 1/10/2023
Title: Request for approval to execute an amendment with BGE, Inc. in the amount of $44,300.00 for Professional Engineering Services to provide improvements to Hufsmith-Kohrville Road Segment 2, UPIN 15104M23NP02, Precinct 3 (project was awarded prior to launch of County's M/WBE Program).
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): UPIN 15104M23NP02
Vendor/Entity Legal Name (if applicable): BGE, Inc.

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program

Request Summary (Agenda Caption):
title
Request for approval to execute an amendment with BGE, Inc. in the amount of $44,300.00 for Professional Engineering Services to provide improvements to Hufsmith-Kohrville Road Segment 2, UPIN 15104M23NP02, Precinct 3 (project was awarded prior to launch of County's M/WBE Program).
end

Background and Discussion:
The County engaged BGE, Inc. in 2014, and now seeks BGE, Inc., to facilitate the redesign of a standard four (4) lane concrete boulevard in 100-foot ROW with a 32-foot raised median and underground storm sewer system for the updated limits from 250' south of Rolling Glen Lane to 700' north of Ezekiel Road. The redesign will incorporate the modification of roadside ditches to underground storm sewer with the option of shallow swales behind the curb. At the intersections of Hufsmith-Kohrville Road at Old Hufsmith-Kohrville Road/Lacy Road and Hufsmith-Kohrville Road at Ezekiel Road, design an upgraded signal to a mast arm and the related pedestrian appurtenances. The redesign is to include a 5-foot-wide sidewalk along the east and west ROW from Old Hufsmith-Kohrville Rd/Lacy Road to the northern project limit. The sidewalk will tie into the proposed 10-foot-wide trail around the north detention basin. The southern detention basin outfalls into the Hufsmith-Kohrville Road Segment 1 storm sewer system and basin. The Hufsmith-Kohrville Road Segment 1 basin will be expanded in size to accommodate the Atlas 14 rainfall...