Title: Request for approval to execute an amendment with R.G. Miller Engineers, Inc. in the amount of $167,679.56 for Professional Engineering Services to provide improvements to Spring Stuebner Road Segment E from west of Leitner Way to SH 99, UPIN 20104MF1BX01, Precinct 3 (project was awarded prior to launch of County's M/WBE Program).

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): 20104MF1BX01

Vendor/Entity Legal Name (if applicable): R.G. Miller Engineers, Inc.

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - project was awarded prior to launch of County's M/WBE Program

 

 

Request Summary (Agenda Caption):

title

Request for approval to execute an amendment with R.G. Miller Engineers, Inc. in the amount of $167,679.56 for Professional Engineering Services to provide improvements to Spring Stuebner Road Segment E from west of Leitner Way to SH 99, UPIN 20104MF1BX01, Precinct 3 (project was awarded prior to launch of County’s M/WBE Program).

end

 

Background and Discussion:

The County engaged R.G. Miller Engineers, Inc. in 2020 and initiated a professional services agreement on May 19, 2020, and now seeks an amendment with R.G. Miller Engineers, Inc. to facilitate the study and design changes associated with the updated scope requested by the County. R.G. Miller Engineers, Inc. is qualified to perform these professional services.

 

Expected Impact:

This amendment proposes to revise the proposed roadway, revise drainage calculations & report, and add sidewalk along the corridor. The project will address increase connectivity, address current and future traffic volumes, reduce delays, and provide safe mobility for residents, pedestrians, and drivers.

 

Alternative Options:

The alternative would be to not update the roadway alignment, drainage, or add new sidewalk along the corridor.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

May 19, 2020

I.1.g.10

Recommendation for authorization to enter into an agreement with R.G. Miller Engineers, Inc.

 

Location:

Address (if applicable): Spring Stuebner Rd from 500-ft West of Leitner Way Drive to West of State Highway 99

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Professional Engineering Services

 

SFY 22

FY 23

Next 3 FYs

Incremental Expenditures (do NOT write values in thousands or millions)

Labor Expenditures

$

$

$

Non-Labor Expenditures

$167,679.56

$

$

Total Incremental Expenditures

$167,679.56

$

$

Funding Sources (do NOT write values in thousands or millions)

Existing Budget

Other

$167,679.56

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Current Budget

$167,679.56

$

$

Additional Budget Requested

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Additional Budget Requested

$

$

$

Total Funding Sources

$167,679.56

$

$

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

Anticipated Court Date: September 27, 2022

Anticipated Implementation Date (if different from Court date): N/A

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Maria de la Piedra, PCT 3 Assistant Project Manager, HCED CIP

Attachments (if applicable): Amendment to Agreement