Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): 23103MF2PH01
Vendor/Entity Legal Name (if applicable): IDS Engineering Group, Inc.
MWDBE Contracted Goal (if applicable): 31.6%
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with IDS Engineering Group, Inc. in the amount of $771,223.50 for Professional Engineering Services to provide a Corridor Study to Holzwarth Road from Cypresswood Drive to Spring Cypress Road, UPIN 23103MF2PH01, Precinct 3, MWDBE Advertised Goal 20%, MWDBE Contracted Goal 31.6%.
end
Background and Discussion:
This project is in NW Harris County, classified as a major thoroughfare with high volumes of traffic. A significant number of accidents have been reported for portions of this corridor.
Expected Impact:
The intent of this study of the Holzwarth Road corridor is to evaluate traffic conditions along this corridor between Cypresswood Drive to Spring Cypress Road and provide alternatives to increase safety and improve traffic conditions. This will include proposing improvements to multiple intersections along the corridor.
Alternative Options:
The alternative is to not conduct this corridor study, and consequently not move forward with any design projects eventually proposed by the study, and leave the roadway and intersections as-is with safety issues.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
_ Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
June 28, 2022 |
98. |
Recommendation for authorization to negotiate with: IDS Engineering Group Inc. |
Location:
Address (if applicable): Holzwarth Road - from Cypresswood Drive to Spring Cypress Road
Precinct(s): Precinct 3
Fiscal and Personnel Summary |
Service Name |
Professional Engineering Services |
|
SFY 22 |
FY 23 |
Next 3 FYs |
Incremental Expenditures (do NOT write values in thousands or millions) |
Labor Expenditures |
$ |
$ |
$ |
Non-Labor Expenditures |
$771,223.50 |
$ |
$ |
Total Incremental Expenditures |
$771,223.50 |
$ |
$ |
Funding Sources (do NOT write values in thousands or millions) |
Existing Budget |
Other |
$771,223.50 |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
Total Current Budget |
$771,223.50 |
$ |
$ |
Additional Budget Requested |
Choose an item. |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
Total Additional Budget Requested |
$ |
$ |
$ |
Total Funding Sources |
$771,223.50 |
$ |
$ |
Personnel (Fill out section only if requesting new PCNs) |
Current Position Count for Service |
- |
- |
- |
Additional Positions Requested |
- |
- |
- |
Total Personnel |
- |
- |
- |
Anticipated Court Date: September 13, 2022
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Maria de la Piedra, PCT 3 Assistant Project Manager, HCED CIP
Attachments (if applicable): Agreement