Harris County Logo
File #: 22-5501    Version: 1 Name:
Type: Contract - Award Status: Agenda Ready
File created: 9/6/2022 In control: Commissioners Court
On agenda: 9/13/2022 Final action: 9/13/2022
Title: Request for approval to execute an agreement with IDS Engineering Group, Inc. in the amount of $771,223.50 for Professional Engineering Services to provide a Corridor Study to Holzwarth Road from Cypresswood Drive to Spring Cypress Road, UPIN 23103MF2PH01, Precinct 3, MWDBE Advertised Goal 20%, MWDBE Contracted Goal 31.6%.
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): 23103MF2PH01
Vendor/Entity Legal Name (if applicable): IDS Engineering Group, Inc.

MWDBE Contracted Goal (if applicable): 31.6%
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with IDS Engineering Group, Inc. in the amount of $771,223.50 for Professional Engineering Services to provide a Corridor Study to Holzwarth Road from Cypresswood Drive to Spring Cypress Road, UPIN 23103MF2PH01, Precinct 3, MWDBE Advertised Goal 20%, MWDBE Contracted Goal 31.6%.
end

Background and Discussion:
This project is in NW Harris County, classified as a major thoroughfare with high volumes of traffic. A significant number of accidents have been reported for portions of this corridor.

Expected Impact:
The intent of this study of the Holzwarth Road corridor is to evaluate traffic conditions along this corridor between Cypresswood Drive to Spring Cypress Road and provide alternatives to increase safety and improve traffic conditions. This will include proposing improvements to multiple intersections along the corridor.

Alternative Options:
The alternative is to not conduct this corridor study, and consequently not move forward with any design projects eventually proposed by the study, and leave the roadway and intersections as-is with safety issues.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
_ Flooding
_ Environment
_ Governance and Customer Service

Prior Court Action (if any):
Date
Agenda Item #
Action Taken
June 28, 2022
98.
Recommendation for authorization to negotiate with: IDS Engineering Group Inc.