File #: 22-5272    Version: 1 Name:
Type: Public Necessity Status: Passed
File created: 8/25/2022 In control: Commissioners Court
On agenda: 9/13/2022 Final action: 9/13/2022
Title: Request for approval to decree that the Hardy Toll Road Downtown Connector serves a public purpose and public necessity requiring the Harris County Real Property Division be directed to acquire an easement from Kurtz Properties LTD for access to the future Hardy Toll Road Downtown Connector.
Attachments: 1. 22-5272 - Parcel 156E Parcel Plat Legal Description

Department: Toll Road Authority

Department Head/Elected Official: Roberto Treviño, P.E., Executive Director

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Public Necessity

 

Project ID (if applicable): N/A

Vendor/Entity Legal Name (if applicable): Kurtz Properties LTD

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval to decree that the Hardy Toll Road Downtown Connector serves a public purpose and public necessity requiring the Harris County Real Property Division be directed to acquire an easement from Kurtz Properties LTD for access to the future Hardy Toll Road Downtown Connector.

end

 

Background and Discussion:

The access for maintenance of Harris County TR 1104 (Tract A) and the existing storm sewer trunkline is restricted by the proximity of Union Pacific and BNSF facilities.  In addition to Harris County Toll Road Authority (HCTRA) not being able to access the tract, as it is currently landlocked by the rail lines, Kurtz Properties LTD needs additional storm sewer and detention capacity.

 

To meet the needs of both parties, Kurtz Properties LTD will allow HCTRA to utilize existing driveways serving Houston Foam Plastics to access Tract A through an access easement.  In return for the access easement, HCTRA will allow 6.19 cfs of stormwater runoff from the future development of Houston Foam Plastics Building 4 into the HCTRA storm sewer trunkline and provide 0.73 acre-feet of detention volume within HCTRA’s detention facility. The Harris County Real Property Division will assist HCTRA to develop and negotiate an agreement documenting the terms and conditions of this access easement.

 

Expected Impact:

HCTRA’s Engineer has determined the proposed site development will not increase the discharge to the proposed Hardy Toll Road Downtown drainage system as the area of interest was considered as fully developed in the drainage study performed for the project.

 

Alternative Options:

No other recommended services for this identified need.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable):  N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering and Construction Services

 

SFY 22

FY 23

Next 3 FYs

Incremental Expenditures (do NOT write values in thousands or millions)

Labor Expenditures

$

$

$

Non-Labor Expenditures

$

$

$

Total Incremental Expenditures

$

$

$

Funding Sources (do NOT write values in thousands or millions)

Existing Budget

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Current Budget

$

$

$

Additional Budget Requested

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Additional Budget Requested

$

$

$

Total Funding Sources

$

$

$

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

 

Anticipated Court Date: September 13, 2022

Anticipated Implementation Date (if different from Court date): Development of agreement pending approval of Purpose and Need

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department:  Nicole Stuttz, Chief of Staff, Harris County Toll Road Authority

Attachments (if applicable):  Parcel plats and legal descriptions of proposed easement; Drainage Analysis