File #: 22-4642    Version: 1 Name:
Type: Report Status: Passed
File created: 7/26/2022 In control: Commissioners Court
On agenda: 8/2/2022 Final action: 8/2/2022
Title: Request for approval of the Final Study Report by HDR Engineering, Inc. for High Meadows and Fairgreen Subdivision Drainage Improvements - 2018, UPIN 19102MF17C01, Precinct 2.
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

Project ID (if applicable): 19102MF17C01
Vendor/Entity Legal Name (if applicable): HDR Engineering, Inc.

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval of the Final Study Report by HDR Engineering, Inc. for High Meadows and Fairgreen Subdivision Drainage Improvements - 2018, UPIN 19102MF17C01, Precinct 2.
end

Background and Discussion:
HDR Engineering, Inc. was authorized to perform study, design, and bid phase engineering services for the High Meadows and Fairgreen Subdivision Drainage Improvements - 2018 project within Harris County Precinct 2. The results of these studies determine that the proposed improvement do not cause any adverse impact to the receiving drainage system. The drainage impact analysis determined that the proposed design would raise the drainage system's level of service to the 10-Year Storm Event. The proposed design was developed to conform to HCED's Regulations for the approval and acceptance of Infrastructure which include adding additional and new storm sewer systems along Charriton DR, Debeney DR, and Fern Meadow LN as well as remove/replacement of roadway.

Expected Impact:
Approval of the Final Study Report will allow the High Meadows and Fairgreen Subdivision Design and Construction to move forward. For the 100-Year storm event, this project will provide reduced flood rick for 10 homes.

Alternative Options:
No alternative option for this project is possible other than performing no additional work. However, in this area, the subdivision will continue to be a risk of flooding and structural damage to homes in the community.




Alignment with Goal(s):
...

Click here for full text