Harris County Logo
File #: 22-4641    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 7/26/2022 In control: Commissioners Court
On agenda: 8/2/2022 Final action: 8/2/2022
Title: Request for approval to execute a service outlet location statement for the installation of an electric meter with CenterPoint Energy and authorize the County Auditor to pay monthly bills for 19044 1/2 Cypress Rosehill Rd, Cypress, TX 77429 (intersection of Cypress Rose Hill Rd at Juergen Rd) for electrical power serving a traffic signal, Precinct 4.
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): UPIN 22035MF28501
Vendor/Entity Legal Name (if applicable): CenterPoint Energy

MWDBE Contracted Goal (if applicable): n/a
MWDBE Current Participation (if applicable): n/a
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval to execute a service outlet location statement for the installation of an electric meter with CenterPoint Energy and authorize the County Auditor to pay monthly bills for 19044 1/2 Cypress Rosehill Rd, Cypress, TX 77429 (intersection of Cypress Rose Hill Rd at Juergen Rd) for electrical power serving a traffic signal, Precinct 4.
end

Background and Discussion:
A traffic study was conducted at Cypress Rose Hill Rd at Juergen Rd, which warranted a traffic signal at the intersection. The traffic signal will enhance safety as it relates to the intersection operations. The service outlet location statement is needed to establish electrical service from CenterPoint Energy to power the traffic signal.

Expected Impact:
Approval of the service outlet location statement will allow CenterPoint Energy to establish electrical service to the traffic signal, which is needed to enhance the safety and operation of the intersection of Cypress Rose Hill Rd at Juergen Rd.


Alternative Options:
All Traffic Signals require a power source, which is typically obtained through CenterPoint Energy. Alternative options are to place a generator, which is not reliable, or not install the traffic signal at the intersection. Both options pose a public safety concern and will impact the operation and increase delay of the intersection.