File #: 22-4593    Version: 1 Name:
Type: Contract - Award Status: Agenda Ready
File created: 7/25/2022 In control: Commissioners Court
On agenda: 8/2/2022 Final action: 8/2/2022
Title: Request for approval to execute an agreement with RPS Infrastructure, Inc. in the amount of $75,686.50 for Professional Engineering Services to provide Traffic Signal improvements to North Eldridge Parkway at Fetlock Drive, UPIN 23035MF2NK01, Precinct 3, MWDBE Contracted Goal 37.5%.
Attachments: 1. 22-4593 Consultant - RPS Infrastructure P3.pdf
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): UPIN 23035MF2NK01
Vendor/Entity Legal Name (if applicable): RPS Infrastructure, Inc.

MWDBE Contracted Goal (if applicable): 37.5%
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with RPS Infrastructure, Inc. in the amount of $75,686.50 for Professional Engineering Services to provide Traffic Signal improvements to North Eldridge Parkway at Fetlock Drive, UPIN 23035MF2NK01, Precinct 3, MWDBE Contracted Goal 37.5%.
end

Background and Discussion:
A traffic study was conducted at North Eldridge Parkway at Fetlock Drive, which warranted a traffic signal at the intersection. The traffic signal will enhance safety as it relates to the intersection operations.

Expected Impact:
The installation of the new traffic signal will improve the operations and public safety of the intersection.

Alternative Options:
Intersections are evaluated in accordance with the 2011 Texas Manual on Uniform Control Devices (TMUTCD), which takes into consideration traffic volume, crashes, pedestrian activity, and roadway network. The intersection was evaluated and a traffic signal was warranted. One alternative option is to not install a traffic signal, which may not improve the public safety of the intersection.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
x Transportation
_ Flooding
_ Environment
_ Governance and Customer Service

Prior Court Action (if any):
Date
Agenda Item #
Action Taken
05/24/2022
102
Authorization to Negotiate - RPS Infrastructure, Inc.

Location:
Address (if applicable): North Eldridge Parkway at Fetlock Drive
Precinct(s):...