File #: 22-4511    Version: 1 Name:
Type: Contract - Award Status: Agenda Ready
File created: 7/21/2022 In control: Commissioners Court
On agenda: 8/2/2022 Final action: 8/2/2022
Title: Request for approval of an agreement with the Harris County Flood Control District for the Smith Road Channel Diversion Drainage Improvements Project in the amount of $6,657,802 utilizing 2017 Harvey CDBG-DR Round One Funds.
Department: Community Services
Department Head/Elected Official: Adrienne M. Holloway, Ph.D., Executive Director

Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award

Project ID (if applicable): D2017-023
Vendor/Entity Legal Name (if applicable): Harris County Flood Control District

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program

Request Summary (Agenda Caption):
title
Request for approval of an agreement with the Harris County Flood Control District for the Smith Road Channel Diversion Drainage Improvements Project in the amount of $6,657,802 utilizing 2017 Harvey CDBG-DR Round One Funds.
end

Background and Discussion:
Harris County Flood Control District (HCFCD) proposed to construct 84" reinforced concrete storm sewer along Smith Road from HCFCD Unit P133-00-00 southward, thence eastward along HCFCD Unit P133-06-00 and the existing Dory Lee Street right-of-way, and back into HCFCD Unit P133-00-00. The storm sewer will be constructed along the west side of Smith Road to avoid existing natural gas line utilities on the east side of the road. This shall benefit 10,791 persons with drainage improvements. Of these persons, 8,126 persons, or 75.30%, are low- to moderate-income.

Expected Impact:
To improve regional drainage and reduce structural and street flood level, reducing the vulnerability of residential structures from future flooding events. The amount of 2017 Harvey CDBG-DR Round One Funds utilized for construction costs only of this project totals $6,657,802. This number is the amount that HCFCD received for the project and is the relevant cost for the agreement. All funds mentioned are 2017 Harvey CDBG-DR Round One funds.

Alternative Options:
N/A

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
_ Transportation
X F...