File #: 21-6331    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 11/15/2021 In control: Commissioners Court
On agenda: 11/30/2021 Final action: 11/30/2021
Title: Request for approval of a change in contract with Texas Materials Group, Inc. in connection with Hufsmith Rd 1 (Road Construction), with an addition in the amount of $113,776.80, Job No. 20/0332-1, UPIN 17104MF0KW01, Precinct 4.
Attachments: 1. 21-6331 CIC - Hufsmith Rd 1 P4.pdf
Department: County Engineer
Department Head/Elected Official: Loyd Smith, P.E., Interim County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Job No. 20/0332
Vendor/Entity Legal Name (if applicable): Texas Materials Group, Inc.
MWDBE Participation (if applicable): N/A

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Texas Materials Group, Inc. in connection with Hufsmith Rd 1 (Road Construction), with an addition in the amount of $113,776.80, Job No. 20/0332-1, UPIN 17104MF0KW01, Precinct 4.
end

Background and Discussion:
Project includes widening of Hufsmith Road, from Burroughs Park to Saddlecliff Trail to 3 lane asphalt road with continuous left turn lane. Change includes change in subgrade stabilization method and removal and replacement of unsuitable subgrade materials. Change also includes hot tap of an unknown utility.




Expected Impact:
Change allows subgrade stabilization in accordance with Harris County standards and identification of an unidentified utility line in conflict with proposed improvements.





Alternative Options:
Reduce the scope of the project to exclude the sections of roadway where unsuitable soils exist and where the utility conflict prevents installation of the proposed improvements.



Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
x Transportation
_ Flooding
_ Environment
_ Governance and Customer Service

Prior Court Action (if any):
Date
Agenda Item #
Action Taken
12/15/2020
23.d.10.b
Contract Award


Location:
Address (if applicable):
Precinct(s): Precinct 4


Fiscal and Personnel Summary
Service Name


FY 21-22
FY 22
Next 3 FYs
Incremental Expenditures (do NOT write values in thousands or millions)
Labor Expenditures
$
$
$
Non-Labor Expenditures
$4,425,787.35
$
$
Total Incremental Expenditures
$4,425,787.35
$
$
Funding Sources (do NOT write values in thou...