Department: County Engineer
Department Head/Elected Official: Loyd Smith, P.E., Interim County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Utility Agreement
Project ID (if applicable): UPIN 20104MF1BW01
Vendor/Entity Legal Name (if applicable): CenterPoint Energy, LLC
MWDBE Participation (if applicable): N/A
Request Summary (Agenda Caption):
title
Request for approval to execute a service outlet location statement with CenterPoint Energy, LLC and authorize the County Auditor to pay monthly bills for the installation of an electric meter at 20604 ½ Ella Blvd, Spring, TX 77388 (intersection Spring Cypress Road at Ella Boulevard) for electrical power serving a traffic signal, UPIN 20104MF1BW01, Precinct 4.
end
Background and Discussion:
Intersection Improvement - Spring Cypress Rd at Ella Blvd. - 2019 is a Capital Improvement Project to increase pedestrian safety and enhance traffic movements at the existing signalized intersection. The service outlet location statement is needed re-establish electrical service from CenterPoint Energy to power the traffic signal.
Expected Impact:
Approval of the service outlet location statement will allow CenterPoint Energy to re-establish electrical service to the traffic signal, which is needed to enhance the safety and operation of the intersection of Spring Cypress Road at Ella Boulevard.
Alternative Options:
All Traffic Signals require a power source, which is typically obtained through CenterPoint Energy. Alternative options are to place a generator, which is not reliable, or not install/remove the traffic signal from the intersection. Both options pose a public safety concern and will impact the operation and increase delay of the intersection.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
_ Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any): N/A
Date |
Agenda Item # |
Action Taken |
|
|
|
Location:
Address (if applicable): 20604 ½ Ella Blvd, Spring TX 77388
Precinct(s): Precinct 4
Fiscal and Personnel Summary |
Service Name |
- |
FY 21-22 |
Estimates |
|
|
|
FY 22 |
Next 3 FYs |
Incremental Expenditures |
Labor Expenditures |
- |
- |
- |
Non-Labor Expenditures |
- |
- |
- |
Total Incremental Expenditures |
- |
- |
- |
Funding Sources (General Fund, PIC Fund, Debt or CP, Grants, or Other - Please Specify) |
Existing Budget |
- |
- |
- |
- |
|
- |
- |
- |
- |
|
- |
- |
- |
- |
Total Current Budget |
- |
- |
- |
Additional Budget Requested |
- |
- |
- |
- |
|
- |
- |
- |
- |
|
- |
- |
- |
- |
Total Additional Budget Requested |
- |
- |
- |
Total Funding Sources |
- |
- |
- |
Personnel (Fill out section only if requesting new PCNs) |
Current Position Count for Service |
- |
- |
- |
Additional Positions Requested |
- |
- |
- |
Total Personnel |
- |
- |
- |
Anticipated Implementation Date: October 12, 2021
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Brannan Hicks, P.E., Traffic Design and Operations Manager, HCED
Attachments (if applicable): Service Outlet Data Statement (SOLS)