File #: 21-5298    Version: 1 Name:
Type: Policy Status: Passed
File created: 10/1/2021 In control: Commissioners Court
On agenda: 10/12/2021 Final action: 10/12/2021
Title: Request for approval of a study report prepared by Bleyl Engineering for Prestonwood Forest Subdivision Drainage Improvements - 2018 project as part of the Flood Control District Bond Program, UPIN 19104MF16Q01, Precinct 4.
Attachments: 1. 21-5298 Study Report - Prestonwood Forest Sub Drainage Improvements P4.pdf

Department: County Engineer

Department Head/Elected Official: Loyd Smith, P.E., Interim County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Policy

 

Project ID (if applicable): UPIN 19104MF16Q01

Vendor/Entity Legal Name (if applicable): Bleyl Engineering

MWDBE Participation (if applicable): N/A

 

Request Summary (Agenda Caption):

title

Request for approval of a study report prepared by Bleyl Engineering for Prestonwood Forest Subdivision Drainage Improvements - 2018 project as part of the Flood Control District Bond Program, UPIN 19104MF16Q01, Precinct 4.

end

 

Background and Discussion:

This project is located northwest of Harris County in the Cypress Creek watershed. The Prestonwood Forest project area consists of Hargrave road north roadside drainage ditch and a connecting drainage ditch that parallels Cutten Road. The scope approved on Commissioners Court (June 9,2020) consisted of re- evaluation of the recommendation made during the planning study of this project. It was determined that regrading Hargrave Road and BNSF Railway ditches with installing new culverts and underground storm sewer pipes will improve the conveyance and capacity of the ditch system to improve the drainage for localized flooding events in the neighborhood. This study report is an executive summary with supporting appendices of detail to describe the design and construction scope moving forward.

 

 

 

 

Expected Impact:

This study report documents the study phase engineering completed for the Prestonwood Forest Subdivision Drainage Improvements. Once the final engineering design and ultimate construction is completed, there will be reduction in flood risk for the Prestonwood Forest neighborhood. This project is a step in the process to reduce the financial, physical, and emotional burden flood damage places on homeowners and will reduce the financial impact of recovery costs to the Prestonwood Forest subdivision homeowners, Harris County, and FEMA. There are no direct staffing or fiscal impacts for this item.

 

 

 

 

 

Alternative Options: N/A

 

 

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

6/09/2020

20

Professional Services Agreement

 

 

Location:

Address (if applicable):

Precinct(s): Precinct 4

 

 

Fiscal and Personnel Summary

Service Name

-

FY 21-22

Estimates

 

 

 

FY 22

Next 3 FYs

Incremental Expenditures

Labor Expenditures

-

-

-

Non-Labor Expenditures

-

-

-

Total Incremental Expenditures

-

-

-

Funding Sources (General Fund, PIC Fund, Debt or CP, Grants, or Other - Please Specify)

Existing Budget

Fund 1080 - Special Mobility Funds-

-

-

-

 

-

-

-

-

 

-

-

-

-

Total Current Budget

-

-

-

Additional Budget Requested

Fund 1080 - Special Mobility Funds-

-

-

-

 

-

-

-

-

 

-

-

-

-

Total Additional Budget Requested

-

-

-

Total Funding Sources

-

-

-

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

 

 

Anticipated Implementation Date: October 12, 2021

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Marcus Baskin, Recovery and Resiliency Division Manager, Harris County Engineering Department

 

Attachments (if applicable): Study Report