Department: County Engineer
Department Head/Elected Official: John R. Blount, P.E., County Engineer
Regular or Supplemental RCA:
☒ Regular RCA
☐ Supplemental RCA
Type of Request: Authorization to Negotiate
Project ID (if applicable): 22103N306630001
Vendor/Entity Legal Name (if applicable): Sander Engineering Corp
MWDBE Participation (if applicable): N/A
Request Summary (Agenda Caption):
title
Request for approval to negotiate with Sander Engineering Corp. for Professional Engineering Services for the design and construction of the remaining two (2) lanes of a standard four (4) lane concrete boulevard for the North Eldridge Parkway - from South of Pine Drive to South of Lakewood Meadow Drive - 2021, Precinct 3.
end
Background and Discussion:
The County will engage Sander Engineering Corp to study and design the project. The goal of improving with North Eldridge Parkway - from South of Pine Drive to South of Lakewood Meadow Drive is to achieve a level of service to meet current and future traffic volumes and reduce delays. Sander Engineering Corp is qualified to perform these services. The firm is registered with Harris County Engineering Department Professional Service Registry.
Expected Impact:
The project will address current and future traffic volumes, reduce delays and improve drainage along this section of North Eldridge Parkway.
Alternative Options:
If the County does not authorize the negotiations with SANDER ENGINEERING CORP, North Eldridge Parkway will remain with the existing two lane road which will traffic congestion for the general public as the area is experiencing growth.
Alignment with Goal(s):
☐ Justice and Safety
☐ Economic Opportunity
☐ Housing
☐ Public Health
☒ Transportation
☐ Flooding
☐ Environment
☐ Governance and Customer Service
Prior Court Action (if any): N/A
Location:
Address (if applicable list below): N/A
☐ Countywide
☐ Precinct 1
☐ Precinct 2
☒ Precinct 3
☐ Precinct 4
Fiscal and Personnel Summary |
Service Name |
- |
FY 21-22 |
Estimates |
|
|
|
FY 22 |
Next 3 FYs |
Incremental Expenditures |
Labor Expenditures |
- |
- |
- |
Non-Labor Expenditures |
- |
- |
- |
Total Incremental Expenditures |
- |
- |
- |
Funding Sources (General Fund, PIC Fund, Debt or CP, Grants, or Other - Please Specify) |
Existing Budget |
- |
- |
- |
- |
|
- |
- |
- |
- |
|
- |
- |
- |
- |
Total Current Budget |
- |
- |
- |
Additional Budget Requested |
- |
- |
- |
- |
|
- |
- |
- |
- |
|
- |
- |
- |
- |
Total Additional Budget Requested |
- |
- |
- |
Total Funding Sources |
- |
- |
- |
Personnel (Fill out section only if requesting new PCNs) |
Current Position Count for Service |
- |
- |
- |
Additional Positions Requested |
- |
- |
- |
Total Personnel |
- |
- |
- |
Anticipated Implementation Date: 9/14/2021
Emergency/Disaster Recovery Note:
☒ Not an emergency, disaster recovery, or COVID-19 related item
☐ Emergency Item
☐ COVID-19 related Item
☐ Disaster Recovery related Item
Contact(s) name, title, department:
Ashleigh Williams, PCT 3 Team Lead, Engineering Department
Bob Bosworth, PCT 3 Coordinator, Engineering Department
Attachments (if applicable): N/A