Harris County Logo
File #: 21-2687    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 6/1/2021 In control: Commissioners Court
On agenda: 6/8/2021 Final action: 6/8/2021
Title: Request for authorization to negotiate an Agreement with Raba-Kistner Consultants, Inc. to provide construction materials testing and geotechnical engineering services for Heavy Highway, Drainage, and Bridge Maintenance Package for Harris County Toll Road Authority's Roadway (Precinct 4).

 

 

 

To:                                                               Harris County Commissioners Court

 

Date:                                                               June 8, 2021

 

Through:                     Dr. Reynaldo Guerra, P.E., Deputy Director Operational and Facility Infrastructure, Toll Road Authority

prepared

Prepared By:                     Leilany Thielen, P. E., Maintenance Engineer Operational and Facility Infrastructure, Toll Road Authority

 

Subject:                      Request to Negotiate an Agreement for construction material testing and geotechnical engineering 

end

Project ID (If applicable]:

 

Purpose and Request:

title

Request for authorization to negotiate an Agreement with Raba-Kistner Consultants, Inc. to provide construction materials testing and geotechnical engineering services for Heavy Highway, Drainage, and Bridge Maintenance Package for Harris County Toll Road Authority’s Roadway (Precinct 4).

end

Background and Discussion:

The resulting Agreement will ensure that the appropriate materials tests are performed to verify compliance with the project plans and specifications. Contract 241 is a HCTRA capital maintenance contract to perform multiple maintenance projects on the HCTRA system in Precinct 4. Projects included were identified by the annual system inspection as well as by HCTRA maintenance personnel, and the project package was designed by Costello, Inc. This type of capital maintenance contract has proven very valuable to HCTRA over the past 10 years. The expected project duration is 18 months.

 

Fiscal Impact:

Funding for this request will come from the Toll Road Authority.

 

Fiscal Summary

 Expenditures

FY 21-22

FY 22-23 Projected

Future Years Projected [3 additional years]

Service Impacted:  [Please provide service or division where expenditure will be used]*

 TRA

 TRA

 TRA

Existing Budget

Capital

Capital

Capital

Additional Appropriation Requested

$0

$0

$0

Total Expenditures

TBD

TBD

TBD

Funding Sources

 

 

 

Existing Department Budget

TRA

TRA

TRA

Please Identify Funding Source (General Fund, PIC, Special Revenue, Grant, Etc.)

 Capital

 Capital

 Capital

[INSERT FUNDING SOURCE HERE]*

TRA-Capital

TRA-Capital

TRA-Capital

Total Sources

TRA-Capital

TRA-Capital

TRA-Capital

 

Alternatives:

No other recommended solution for this identified need.

 

Alignment with Strategic Objective:

This recommendation aligns with HCTRA’s strategic objective (MACE-S01) to proactively maintain and continuously improve the roadways and toll facilities to provide a safe and efficient means of travel for the residents of and visitors of Harris County.

 

Attachments: None