Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): P518-11-00-E002
Vendor/Entity Legal Name (if applicable): DNT Construction LLC
MWBE Contracted Goal (if applicable): 18.40%
MWBE Current Participation (if applicable): 15.44%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of change in contract No. 1 with DNT Construction LLC, for the Isom Stormwater Detention Basin, resulting in an addition of $37,952 to the contract amount (Halls Bayou Watershed, Bond ID C-41, Project ID P518-11-00-E002, Job No. 26/0086, Precinct 2, CDBG-DR, MWBE Contracted Goal: 18.40%, MWBE Current Participation: 15.44%).
end
Background and Discussion:
This change in contract is needed to complete the construction contract for this project. The project connects the P518-11-00 basin to the existing P518-11-00 wet-bottom basin and includes clearing and grubbing, demolition of existing structures, earthwork, installation of new drainage systems and stormwater control structures, all-weather access road and gates. The purpose of this contract change is to increase the quantities of construction fencing needed for AST habitat delineation and disposal of concrete rubble discovered on site. The contract change includes an increase in the project cost by $37,952.00 and 0 days. This represents a 0.39% increase to the original purchase order value of $9,770,000.00 and a 0.0% increase to the original duration of 310 days.
Expected Impact:
This change will allow the contractor to construct the projec...
Click here for full text