Title: Request for approval of a change in contract with iCON GC, LLC, in connection with Forest Shadows Subdivision Drainage Improvements - 2018, adding 62 calendar days, with an addition in the amount of $132,819.56, Job No. 23/0061-1, UPIN 19104MF13X01, Precinct 3, MWDBE Contracted Goal: 30.00%, MWDBE Current Participation: 30.52%.
Sponsors: Mony Hossain
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): UPIN - 19104MF13X01 - Job No. 23/0061
Vendor/Entity Legal Name (if applicable): iCON GC, LLC

MWDBE Contracted Goal (if applicable): 30.00%
MWDBE Current Participation (if applicable): 30.52%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with iCON GC, LLC, in connection with Forest Shadows Subdivision Drainage Improvements - 2018, adding 62 calendar days, with an addition in the amount of $132,819.56, Job No. 23/0061-1, UPIN 19104MF13X01, Precinct 3, MWDBE Contracted Goal: 30.00%, MWDBE Current Participation: 30.52%.
end

Background and Discussion:
The Forest Shadows Subdivision is located in North Harris County, north of FM 1960, east of Rayford Road, and southwest of Cypress Creek. The subdivision is within the Cypress Creek Watershed. The Forest Shadows subdivision is currently drained by roadside ditches and culverts. A portion of the drainage is directed to Theiss Road at the intersection of Forest Glade Drive and eventually through the adjacent subdivision. The southeast portion drains to Turkey Creek. The scope of work for this project consists of regrading roadside ditches, replacing culverts and driveways, construction of a detention basin for mitigation, and roadway improvements consisting of extending Broadmark Lane to provide access to the detention pond and the reconstruction of segments of Theiss Road, Forest Glade Drive and Broadmark Lane.

The change in contract includes the following:

* PCO #1 - Regrade roadside ditches - Addition of quantities to existing line items #6- Regrade roadside ditches by 400 linear feet due to field conditions since the items overran the original commitment am...