Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer
Secondary Department: Commissioner, Precinct 4
Secondary Department Head/Elected Official: Lesley Briones
Regular or Supplemental RCA: Regular RCA
Type of Request: Interlocal Agreement
Project ID (if applicable): 19104MF12M01
Vendor/Entity Legal Name (if applicable): United States Army Corps of Engineers
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable):N/A
Justification for 0% MWBE Participation Goal: Exempt - Interlocal/Cooperative Agreement
Grant Indirect Costs Rate (if applicable):N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an Interagency Agreement with the United States Army Corps of Engineers to construct one (1) new drainage swale and two (2) new stormwater drainage channels to convey stormwater from the subdivision to Langham Creek within Addicks Reservoir, in connection with Bear Creek Village Subdivision Drainage Improvements - 2018, UPIN 19104MF12M01, Precinct 4.
end
Background and Discussion: The Bear Creek Village Subdivision is 675 acres generally bound by Clay Road to the south, State Highway 6 to the west, Addicks Satsuma Road to the north, and the Addicks Reservoir to the east. The structures in the subdivision have suffered repetitive flood losses. Most recently, during Hurricane Harvey, 1,396 structures were flooded. Prior to that, the Tax Day flood in April 2016 flooded 306 structures. Drainage problems within the Bear Creek Village Subdivision primarily result from ponding areas where the storm sewer system is inadequate to collect and drain extreme event runoff. Drainage analysis has shown that street regrading and storm sewer replacement, in addition to channels in the reservoir, will provide the optimal reduction in flooding for the subdivision. The ...