Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): UPIN 26103MZNCC01
Vendor/Entity Legal Name (if applicable): Walter P. Moore & Associates, Inc.
MWBE Contracted Goal (if applicable): 19%
MWBE Current Participation (if applicable): 36.63%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Walter P. Moore & Associates, Inc., in the amount of $995,943.00 in connection with Road Improvements - Westgreen Blvd - Ventura Bay Dr to Bridge Creek Terrace Dr - 2026, UPIN 26103MZNCC01, Precinct 3.
end
Background and Discussion:
Precinct 3 is requesting that the Office of the County Engineer approve an agreement for professional engineering services to advance the Westgreen Boulevard Extension Project, extending from Ventura Bay Drive to Bridge Creek Terrace Drive. The project involves the study, design, and bid of approximately 0.43 miles of new four-lane concrete boulevard along Westgreen Boulevard, including the construction of single-span twin bridges over Langham Creek. The proposed improvements will establish a new roadway connection between Ventura Bay Drive and Bridge Creek Terrace Drive, improving connectivity within the corridor. The project is located within the Addicks Reservoir Watershed and is partially situated within the regulatory floodplain. As such, the engineering effort will include the necessary environmental, drainage, hydraulic, structural, and permitting considerations assoc...
Click here for full text