Legislation Details

File #: 25-6875    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 10/17/2025 In control: Commissioners Court
On agenda: 10/30/2025 Final action: 10/30/2025
Title: Request for approval to execute a Joint Participation Interlocal Agreement with Harris County Municipal Utility District 368 for modifications to a detention basin, extreme event overflow swale, intersection pavement, pump station and generator and the installation of a new storm force main within Northern Point Subdivision, UPIN 19104MF12W01, Precinct 3.
Attachments: 1. Partnership-19104MF12W01-Northern Point subdivision-HC MUD 368-P3.pdf
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP

Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Ed Ramsey, Commissioner

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

Project ID (if applicable): 19104MF12W01
Vendor/Entity Legal Name (if applicable): Harris County Municipal Utility District 368

MWBE Contracted Goal (if applicable): 0%
MWBE Current Participation (if applicable):0%
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute a Joint Participation Interlocal Agreement with Harris County Municipal Utility District 368 for modifications to a detention basin, extreme event overflow swale, intersection pavement, pump station and generator and the installation of a new storm force main within Northern Point Subdivision, UPIN 19104MF12W01, Precinct 3.
end

Background and Discussion:
The Northern Point subdivision has experienced flooding during multiple storm events. Studies performed by the MOD outlined multiple issues that contributed to drainage deficiencies within the subdivision. This subdivision was included in the original list of subdivision drainage projects outlined in the 2018 Flood Control Bond Program.




Expected Impact:
The construction of these projects will provide sheetflow paths, improved pumping capacity for the detention basin, increase storage in another basin (Three Lakes East), and add a secondary pump station with backup generation. These improvements will reduce residential flood risk within the Northern Point subdivision.




Alternative Options:
To not partner with MUD 368 and continue to have a high flood risk.

County Strategic Plan Goal: N/A...