Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP
Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Ed Ramsey, Commissioner
Regular or Supplemental RCA: Regular RCA
Type of Request: Interlocal Agreement
Project ID (if applicable): 19104MF12W01
Vendor/Entity Legal Name (if applicable): Harris County Municipal Utility District 368
MWBE Contracted Goal (if applicable): 0%
MWBE Current Participation (if applicable):0%
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute a Joint Participation Interlocal Agreement with Harris County Municipal Utility District 368 for modifications to a detention basin, extreme event overflow swale, intersection pavement, pump station and generator and the installation of a new storm force main within Northern Point Subdivision, UPIN 19104MF12W01, Precinct 3.
end
Background and Discussion:
The Northern Point subdivision has experienced flooding during multiple storm events. Studies performed by the MOD outlined multiple issues that contributed to drainage deficiencies within the subdivision. This subdivision was included in the original list of subdivision drainage projects outlined in the 2018 Flood Control Bond Program.
Expected Impact:
The construction of these projects will provide sheetflow paths, improved pumping capacity for the detention basin, increase storage in another basin (Three Lakes East), and add a secondary pump station with backup generation. These improvements will reduce residential flood risk within the Northern Point subdivision.
Alternative Options:
To not partner with MUD 368 and continue to have a high flood risk.
County Strategic Plan Goal: N/A...