Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 26/0049, UPIN 24102MF34B01
Vendor/Entity Legal Name (if applicable): Precise Services, Inc.
MWBE Contracted Goal (if applicable): 26.11%
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Precise Services, Inc., in connection with South Belt Basin Improvement, with an addition in the amount of $21,894.36, Job No. 26/0049-1, UPIN 24102MF34B01, Precinct 2, MWBE Contracted Goal: 26.11%, MWBE Current Participation: 100%.
end
Background and Discussion:
This project is part of the Precinct 2 Commissioner Adrian Garcia's Revive2Thrive initiative to focus on revitalization rather than gentrification by empowering communities and creating opportunities for our existing neighborhoods to be more resilient, inclusive, and thriving. The project consists of a 10' wide walking trail, concrete parking lot, parking spaces, park benches, lighting, and trash cans around the South Belt Stormwater Detention Basin.
This change order is tied to PCO -1: The proposed Change Order in the amount of $21,894.36 is necessary to incorporate additional field work identified during construction that was not included in the original contract bid items. The additional work consists of 187 LF of 2-inch Schedule 80 PVC Conduit, three Type D Harris County pull boxes, and the removal and disposal of 191 LF of existing fence, which are required to complete the pro...