Legislation Details

File #: 26-7620    Version: 1 Name:
Type: Contract - Amendment Status: Agenda Ready
File created: 11/4/2026 In control: Commissioners Court
On agenda: 11/19/2026 Final action:
Title: Request for approval of an amendment to an agreement with Agha Engineering, LLC, in the amount of $201,357, to provide additional design, bidding, and construction phase engineering services in support of construction of the Boudreaux Stormwater Detention Basin (Willow Creek Watershed, Bond ID F-106, Project ID M500-10-00-E002, Agreement No. 2024-21, Precinct 3, CDBG-MIT, MWBE Contracted Goal: 19.60%, MWBE Current Participation: 100%).
Attachments: 1. 111926 AMEND AGHA 2024-21 PCT 3 backup.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): M500-10-00-E002
Vendor/Entity Legal Name (if applicable): Agha Engineering, LLC

MWBE Contracted Goal (if applicable): 19.60%
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with Agha Engineering, LLC, in the amount of $201,357, to provide additional design, bidding, and construction phase engineering services in support of construction of the Boudreaux Stormwater Detention Basin (Willow Creek Watershed, Bond ID F-106, Project ID M500-10-00-E002, Agreement No. 2024-21, Precinct 3, CDBG-MIT, MWBE Contracted Goal: 19.60%, MWBE Current Participation: 100%).
end

Background and Discussion:
This amendment will allow continued design engineering and environmental professional services for M500-10-00-E002 Boudreaux Stormwater Detention Basin – Phase I. The Flood Control District will construct the project using funding from the CDBG-MIT grant program. This project includes the design of phase 1 of 3 planned phases of a new stormwater detention basin within the Willow Creek watershed. This amendment adds necessary funds for the completion of the Bid Ready design task. Additional design effort was required to redesign from a wet to dry-bottom pond after the 50% submittal. This was due to FAA regulations.

Expected Impact:
The project seeks to reduce flood risks and strengthen resiliency in the Willow Creek watershed by providing a stormwater...

Click here for full text