File #: 25-4387    Version: 1 Name:
Type: SOLS Status: Passed
File created: 7/2/2025 In control: Commissioners Court
On agenda: 8/7/2025 Final action: 8/7/2025
Title: Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 27419 Nelson Street Spring, TX 77343 for electrical power serving Southwell Park, including all deposit/fees for utility services, UPIN 24103MF3HG01, Precinct 3.
Attachments: 1. SOLS-UPIN 24103MF3HG01-Southwell Park-CenterPoint Energy-P3-7.17.2025.pdf
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Choose an item.
Secondary Department Head/Elected Official:

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): 24103MF3HG01
Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 27419 Nelson Street Spring, TX 77343 for electrical power serving Southwell Park, including all deposit/fees for utility services, UPIN 24103MF3HG01, Precinct 3.
end

Background and Discussion:

The existing facilities have significant ADA compliance issues, Air Circulation issues, and are not resilient and have issues with freezes. Ultimately the Precinct would like the buildings to have HVAC, resilient plumbing, and all ADA issues remedied for all facilities.

Expected Impact:

Approval of the service outlet location statement will allow CenterPoint Energy to establish electrical service to Southwell Park, which is needed to enhance the operations of the park.






Alternative Options:
If the SOLS is not approved, no power will be provided to the park which will impact the day-to-day operations of the park and increase delay of construction.

County Strategic Plan Goal: Choose an item.
County Strategic Plan Objective: Choose an item.
Justice/Safety Initiative (Goal 1): Choose an...