Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): G103-80-03.1-E002
Vendor/Entity Legal Name (if applicable): Transcontinental Gas Pipe Line Company LLC
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a Letter of No Objection with Transcontinental Gas Pipe Line Company, LLC, to construct or conduct channel reconstruction for Taylor Gully and the addition of two detention basins (San Jacinto River Watershed, Project ID G103-80-03.1-E002, Agreement No. 2025-67, Precinct 3).
end
Background and Discussion:
This Utility Agreement Letter of No Objection will allow permissions of the Flood Control District to construct or conduct the proposed channel reconstruction for Taylor Gully and the addition of 2 detention basins over or under an existing 30" natural gas pipeline: G103-80-03.1-E002 Taylor Gully Channel Improvements. The Taylor Gully channel flows west to east, bordering Montgomery County in the northwest and running eastward toward Mills Branch and Caney Creek in Harris County. The proposed project alternative would feature a partially concrete lined channel from the existing drop structure to downstream of Creek Manor Drive, the replacement of the existing culverts on Rustling Elms Drive and a stormwater detention basin. This proposed project alternative was also the recommended alternative from the Kingwood Drainage Analysis. The project is expected to remove the 100-year area o...
Click here for full text