Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 25/0017, UPIN 24102MF3B401
Vendor/Entity Legal Name (if applicable): Hayden Paving, Inc.
MWBE Contracted Goal (if applicable): 21.66%
MWBE Current Participation (if applicable): 95.05%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Hayden Paving, Inc., in connection with final construction of BS2N Hardy/Aldine - 2024, with a deduction in the amount of $541,059.22, Job No. 25/0017-2, UPIN 24102MF3B401, Precinct 2, MWBE Contracted Goal: 21.66%, MWBE Current Participation: 95.05%.
end
Background and Discussion:
The project consists of rehabilitating various asphalt and concrete roadways located within the Hardy/Aldine area of Harris County Precinct 2. The work includes milling and overlaying existing asphalt pavement, performing required base repairs, and applying prime coat, tack coat, and dense-graded surface overlays across the full roadway width. The project also includes full-depth concrete pavement repairs, restoration of a smooth riding surface, and installation of new pavement striping.
This final change order is for a deduction of the final adjustment in the amount of $541,059.22 and includes quantity adjustments of existing items for final values.
Final Adjustment is the reconciliation of actual quantities used in construction against the bid quantities.
The final change in contract includes the following:
PCO#2 Final Adjustment: ($541,059.22) Time...