Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 1
Secondary Department Head/Elected Official: Rodney Ellis, Commissioner
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): 25101MF3UZ01
Vendor/Entity Legal Name (if applicable): Omega Engineers, Inc.
MWBE Contracted Goal (if applicable): 20%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Omega Engineers, Inc. in an amount of $2,156,085.88 for professional engineering services to conduct study and Design for the reconstruction of Rankin Road from Interstate Highway 45 to west of Railroad track (Hardy Road), UPIN 25101MF3UZ01, Precinct 1, MWBE Contracted Goal: 20%.
end
Background and Discussion:
The existing Rankin Road is a typical 4 Lane asphalt road with no median within 80-ft ROW. The proposed typical section options are to be determined during Study Phase: 3 lanes including two-way left turn lane in places or 4 lanes with raised median and left turn lanes. The sidewalk can be installed behind the curb. There is no bus route along Rankin Road. Construction of this project is being funded with federal pass-thru funds from Houston-Galveston Area Council (H-GAC) and managed by Texas Department of Transportation (TxDOT).
Expected Impact:
The project will reconstruct the existing 1.75-mile asphalt pavement and provide a typical concrete pavement section from face of curb to face of curb with 6-foot-wide sidewalks and ADA ramps. The design proposes replacing the existing open ditches with an underground storm sewer...