Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 22/0461, UPIN 19101MF0XV01
Vendor/Entity Legal Name (if applicable): Allgood Construction Co., Inc.
MWBE Contracted Goal (if applicable): 25%
MWBE Current Participation (if applicable): 38.76%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Allgood Construction Co., Inc., in connection with West Gulf Bank Road from I45 to Airline Drive, adding 165 calendar days, with an addition in the amount of $129,743.13, Job No. 22/0461-8, UPIN 19101MF0XV01, Precinct 2, MWBE Contracted Goal: 25%, MWBE Current Participation: 38.76%.
end
Background and Discussion:
This project includes the construction of four 11-foot-wide concrete pavement with a 24-foot median, and 8-foot-wide sidewalk along both sides West Gulf Bank Road from Interstate 45 Freeway to Airline Drive. It also includes the drainage improvements.
The change order includes the following:
- Due to a work conflict, the bus pad at the northeast corner of the Airline intersection had to be removed and reinstalled. Precinct 2 directed Harris County to proceed with full removal and replacement. The Engineer of Record provided recommendations to minimize the impact on the newly constructed bus pad while ensuring proper gutter line construction. This change order will add 2 days and additional cost of $8,031.19 to the contract.
- To address drainage concerns at Station 146+70LT, where the proposed sidewalk would block water o...