File #: 26-7633    Version: 1 Name:
Type: Contract - Amendment Status: Agenda Ready
File created: 11/4/2026 In control: Commissioners Court
On agenda: 11/19/2026 Final action:
Title: Request for approval of an amendment to an advance funding agreement with the Texas Department of Transportation, in the amount of $529,764.35, for voluntary local agreement contributions by the Flood Control District to improve drainage and reduce flood risks in connection with transportation improvement projects with no required match on-system (Luce Bayou Watershed, Bond ID F-108, Project ID S500-02-00-E001, Agreement No. 2022-194, Precinct 3).
Attachments: 1. 111926 AMEND TXDOT 2022-194 PCT 3 backup.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): S500-02-00-E001
Vendor/Entity Legal Name (if applicable): Texas Department of Transportation

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of an amendment to an advance funding agreement with the Texas Department of Transportation, in the amount of $529,764.35, for voluntary local agreement contributions by the Flood Control District to improve drainage and reduce flood risks in connection with transportation improvement projects with no required match on-system (Luce Bayou Watershed, Bond ID F-108, Project ID S500-02-00-E001, Agreement No. 2022-194, Precinct 3).
end

Background and Discussion:
The Flood Control District is working on a flood damage reduction project in the same area where uncontrolled sheet flow is the main cause of inundation impacting the Commons Area and several roads, including FM2100. It was decided to partner with (Texas Department of Transportation) TxDOT to assist with the construction of an 8’X8’ RCB within TxDOT right-of-way to intercept, redirect and detain the sheet flow within the proposed Flood Control District and TxDOT detention basins. The basins will be interconnected and will have a common outfall to Luce Bayou. TxDOT is constructing most of the structural components such as the RCBs and outfalls for HCFCD using their current construction contract. This Amendment will provide for the additi...