Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 25/0065, UPIN 21101MF23H01
Vendor/Entity Legal Name (if applicable): AAA Asphalt Paving, Inc.
MWBE Contracted Goal (if applicable): 28.83%
MWBE Current Participation (if applicable): 40.87%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with AAA Asphalt Paving, Inc., in connection with Houmont Park Subdivision Drainage Improvements - 2018 Green River Drive, adding 45 calendar days, with an addition in the amount of $33,996.69, Job No. 25/0065-2, Bond Fund, UPIN 21101MF23H01, Precinct 1, MWBE Contracted Goal: 28.83%, MWBE Current Participation: 40.87%.
end
Background and Discussion:
This project is located in northeast Harris County in the Greens Bayou (P100-00-00) watershed, east of John Ralston Road and north of Beaumont Highway. The Houmont Park Subdivision Drainage Improvements - Green River Drive - 2018 project site consists of subdivision drainage improvements and roadway reconstruction located at Green River Drive spanning from the bridge at Greens Bayou (HCFCD Unit No. P100-00-00) to Van Hut Lane; discharging into HCFCD Channels P117-00-00, P110-04-00, and P110-00-00. Major work activities include demolition of the existing asphalt roadway and installation of a 26-foot-wide asphalt roadway. The drainage improvements include installing an underground storm sewer, filling in the existing ditches, and placing shallow swales.
The change in contract includes the following: ...