File #: 25-1934    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 3/17/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Request for approval to execute an agreement with Brooks & Sparks, Inc. in the amount of $1,154,217.00 for Professional Engineering Services in connection with the design of Road Improvements - Garth Rd 1 FM 1942 to South of Sterling Summer Dr - 2024, UPIN 24103MF3G901, Precinct 3, MWBE Contracted Goal: 19.60%, MWBE Current Participation: 26.39%.
Sponsors: Mony Hossain
Attachments: 1. 25-1934-Award-UPIN 24103MF3G901-Road Improvements Garth 1-Brooks & Sparks-P3-03-27-2025
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): UPIN 24103MF3G901
Vendor/Entity Legal Name (if applicable): Brooks & Sparks, Inc.

MWBE Contracted Goal (if applicable): 19.60%
MWBE Current Participation (if applicable): 26.39%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Brooks & Sparks, Inc. in the amount of $1,154,217.00 for Professional Engineering Services in connection with the design of Road Improvements - Garth Rd 1 FM 1942 to South of Sterling Summer Dr - 2024, UPIN 24103MF3G901, Precinct 3, MWBE Contracted Goal: 19.60%, MWBE Current Participation: 26.39%.
end

Background and Discussion:
The project is located in east Harris County, north of I-10. The existing Garth Road configuration in the project area (FM 1942 to 100' South of Sterling Summer Drive) is a 2-lane asphalt roadway with roadside ditches that has a non-standard skewed connection with FM 1942. The goal of the project is to design and construct a standard 4-lane concrete boulevard with curb and gutter and to improve the skewed connection to a standard connection.

Expected Impact:

The proposed project will increase the traffic capacity for the active development in this area, as well as improve driver safety at the intersection with FM 1942. The project is funded by 2022 Bond funds.




Alternative Options:

Without this project, the new road improvements on Garth Road will not be realized as requested by Precinct