File #: 25-4516    Version: 1 Name:
Type: Asset Management Status: Passed
File created: 7/21/2025 In control: Commissioners Court
On agenda: 8/7/2025 Final action: 8/7/2025
Title: Request that the County Judge execute a Correction General Warranty Deed for Harris County Flood Control District for the public project known as Helms Stormwater Detention Basin and Conveyance Improvements, tract number P118-00-00-15-035.0, UPIN 23090MF2MG01, Precinct 3.
Attachments: 1. Asset Management-23090MF2MG01-HelmsSWDB&ConeyanceImp-HCFCD-8-7-25.pdf
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Regular or Supplemental RCA: Regular RCA

Type of Request: Asset Management

Project ID (if applicable): 23090MF2MG01
Vendor/Entity Legal Name (if applicable): Not applicable

MWBE Contracted Goal (if applicable): Not applicable
MWBE Current Participation (if applicable): Not applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): Not applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request that the County Judge execute a Correction General Warranty Deed for Harris County Flood Control District for the public project known as Helms Stormwater Detention Basin and Conveyance Improvements, tract number P118-00-00-15-035.0, UPIN 23090MF2MG01, Precinct 3.
end

Background and Discussion:
The Helms Stormwater Detention Basin and Conveyance Improvements project, also known as Bond Project C-01, will construct channel conveyance improvements and a pair of stormwater detention basins to reduce the risk of flooding by taking in excess stormwater during heavy rain events and then releasing it slowly back to the channel when the threat of flooding has passed. Excavation of the stormwater detention basins began in winter 2020 and will hold stormwater that might otherwise flood homes and businesses.

The wrong property description, Grantor's designation and address was inadvertently recorded with the original deed. In order to correct this action, a correction deed prepared by the CAO must be executed by the County Judge.

Expected Impact:
The project will reduce the vulnerability of properties within the project area during future ...