Legislation Details

File #: 26-2218    Version: 1 Name:
Type: Asset Management Status: Passed
File created: 3/31/2026 In control: Commissioners Court
On agenda: 4/16/2026 Final action: 4/16/2026
Title: Request that the County Judge execute a Correction Warranty Deed for Harris County Flood Control District for the public project known as Vince Bayou Channel Conveyance Improvements - I100-00-00-E001, tract number I100-00-00-06-058.0, UPIN 25090MF3N201, Precinct 2.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Regular or Supplemental RCA: Regular RCA

Type of Request: Asset Management

Project ID (if applicable): 25090MF3N201
Vendor/Entity Legal Name (if applicable): Not applicable

MWBE Contracted Goal (if applicable): Not applicable
MWBE Current Participation (if applicable): Not applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): Not applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request that the County Judge execute a Correction Warranty Deed for Harris County Flood Control District for the public project known as Vince Bayou Channel Conveyance Improvements - I100-00-00-E001, tract number I100-00-00-06-058.0, UPIN 25090MF3N201, Precinct 2.
end

Background and Discussion:
The project consists of construction of two detention basins as well as channel modifications at each detention basin location along I100-00-00; These detention basins and channel improvements will increase storage flood volume reduce flooding within the watershed and is phase 1 of the ultimate project recommended in the feasibility study.

The wrong grantee's designation was inadvertently recorded with the original general warranty deed. In order to correct this action, a correction deed prepared by the CAO must be executed by the County Judge.

Expected Impact:
The recommended project will reduce damages for approximately 2 structures from flooding and remove 14 from within the 100-year floodplain layer as well as add approximately 69 ac-ft of additional detention storage for the 100-yr storm event.


Alternative Options:
The alternative to app...

Click here for full text