Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Transmittal
Project ID (if applicable): W140-00-00-X013
Vendor/Entity Legal Name (if applicable): Greater Houston Construction
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Transmittal by the Flood Control District of a certificate of substantial completion with Greater Houston Construction, for concrete channel lining repairs (Buffalo Bayou Watershed, Bond ID CI-018, Project ID W140-00-00-X013, Job No. 25/0066, Precinct 3).
end
Background and Discussion:
This project consists of concrete channel lining repairs of Spring Branch Creek from Bracher Street to Pech Road. Work includes removal and replacement of sections of the concrete channel lining and low flow wall sections, including bottom concrete, cleaning, and sealing existing concrete joints, filling voids underneath and behind existing concrete lining and low flow wall sections, removal of silt deposits on the existing concrete lining, and reworking of the existing weep holes, including cleaning the existing weep holes and installing special maintainable weep hole filters. The overall objective of this work is to extend the useful life of the existing concrete paving in this channel section. Aguirre & Fields, LP is the designated design consulting firm for this project. The project consists of design and construction on Flood Control District property, within Precinct 3 and within City of Houston (COH) limits. The project is in Spring Bra...
Click here for full text